--- 17 ---
10. STANDARD REPAIR TIME (UNIT) SCHEDULES
MODEL
10
20
30
40
Fixed
Variable
H 30PV
Work Flow
Front Cover
O-Ring (S-48)
Retainer Sleeve
Spring (A)
Washer
Damper (A)
Hammer Holder
O-Ring (S-15)
O-Ring (S-38)
Second Hammer
Damper (B)
Hammer
Holder (B)
Cylinder Holder
O-Ring (S-25)
60 min.
50
Gear Cover
Needle Bearing
Armature Ass'y
Ball Bearing
(6001DD)
Ball Bearing
(608VV)
Washer (B)
Washer (A)
Tail Cover
Bearing
Bushing (B)
General Assembly
Front Cap
Grip (A)
Grip (B)
Ball Spring (A)
Ball Spring (B)
Ball Holder
Grip (C)
Cylinder Case
Sleeve (A)
Spring (B)
Cylinder
Housing Ass'y
Stator Ass'y
Handle
Plug (A)
Plug (B)
Crank Shaft
Feather Key
(4 x 4 x 12)
Ball Bearing
(6002DD)
Oil Seal (B)
First Gear
Crank Case
Ass'y
Striker
O-Ring x 2
Piston
Piston Pin
Connecting
Rod
Crank Case
Cover
O-Ring
Switch
Cord