
(b) Models; VB-004(S)E-U to 110-E2
Flange Connection Sizes
MODEL B MODEL
B
VB-004(S)E-U
NPSC
1
1/4
VB-040-E2
NPSC 2
VB-007(S)E-U
NPSC
1
1/2
VB-060-E2
NPSC2 1/2
VB-019(S)E-U
NPSC
1
1/2
VB-080-E2
NPSC 3
VB-030E-U
NPSC 2
VB-110-E2
NPSC 3
5. Bypass Hole Installation
For an application where the Vortex Blower
may be operated in a small airflow range
outside the operable range, provide a
bypass hole near the suction or discharge
port of the Vortex Blower (see illustration to
the right). This enables the Vortex Blower
to operate within the operable range by
adjusting the valve in the bypass hole.
6. Changeover Valve Installation
In the event that the starting frequency of the Vortex Blower is too high, the motor
temperature will rise due to the starting current. The starting torque will cause a developing
clearance in the tolerances between the impeller and the shaft, which can lead to motor
burnout or impeller contact (this will affect the life of the ball bearing).
During unavoidable intermittent operation, a changeover valve system can be installed to
prevent this event from occurring (see the illustrations below).
To operate the Vortex Blower without the changeover valve system, please contact the local
Hitachi distributor.
Bypass Hole
Suction
Discharge
Valve
VB
VB
Intermittent air requirements
Intermittent suction or discharge requirements
B
Thread pipe
(Supplied by customer)
Flange
Fig. 3.5 Pipe connection
The flange size of Vortex Blower is
shown on the table below. Please
see the illustration to the right
(Fig. 3.5) detailing how to properly
connect the thread pipe to the
Vortex Blower. Inspect for any
leaks after installation.
Open
Close
Valve
VB
Valve
Suction
Discharge
VB
- 12 -
Summary of Contents for E-U Series
Page 20: ...Models VB 060 E2 thru VB 110 E2 Fig 7 3 20 ...
Page 23: ... 23 ...