background image

 

STEP 2 

 

1.

 

ATTACH VERTICAL BEAM (4) ONTO THE BASE CONNECT TUBE (1), 
SECURED WITH BOLT (16), WASHER (20), AND NYLON NUT (18), AS 
SHOWN. 
 

2.

 

INSERT TOP CROSS BEAM (5) INTO VERTICAL BEAM (4), SECURED 
WITH BOLT (17) AND ARC WASHER (19), AS SHOWN. 

 
3.

 

PLACE HOOK (14) INTO TOP CROSS BEAM (5), SECURED WITH 
NUT (21), ARC WASHER (19), AND NYLON NUT (18), AS SHOWN. 

 
4.

 

PLACE 60MM ROUND END CAP (12) ONTO TOP CROSS BEAM (5). 

Reviews: