STEP 1
1.
ATTACH STORAGE POST (8) INTO THE HOLES ON THE BASE (1,2,3),
SECURED WITH BOLT (17), AND WASHER (20)AS SHOWN.
2.
PLACE RUBBER END CAP (10) AND RUBBER CAP (11) ONTO THE
BASE (1,2,3). ATTACH LEFT BASE (2) AND RIGHT BASE (3) ONTO
BASE CONNECT TUBE (1), SECURED WITH BOLT (16), WASHER (20),
AND NYLON NUT (18).
3.
PLACE 25MM ROUND END CAP (13) ONTO STORAGE POST (8)