Hisense 55SOA25PT User Manual Download Page 5

 

Hisense B2B

 

 

 

4

 

2.2

 

Power Voltage

 

Please make sure the power voltage at the construction site is compatible to the display.

 

2.3

 

Avoid Water

 

The kiosk has been tested to meet IP65 for outdoor environment, but please do not immerse the kiosk in the 
water.

 

2.4

 

No Touch

 

Do not touch LCD display or cabinet which may scald due to long time sunlight exposure.

 

2.5

 

Avoid Open Flame

 

Do not install it nearby open flame area and no fire closed to the display.

 

 

2.6

 

Installation Place

 

Please follow the instructions and install it firmly on the ground or bracket to prevent any LCD damage.

 

2.7

 

Cooling Performance

 

There is air inlet & outlet in the rear of cabinet do not cover any object that will impact cooling performance.

 

2.8

 

Clean or Maintenance

 

Shut down power before clean or maintenance. 

 

 

2.9

 

Cleaning

 

Use wet cloth to clean rather than liquid cleaners or aerosol cleaners direct on the monitor casing or glass.

 

2.10

 

Expert Engineer Required

 

Summary of Contents for 55SOA25PT

Page 1: ...2021 55SOA25PT Issue Date 03 09 2021 Copyright 2021 All Rights Reserved User Manual Outdoor Series Beyond An Immersive Experience...

Page 2: ...on 3 2 2 Power Voltage 4 2 3 Avoid Water 4 2 4 No Touch 4 2 5 Avoid Open Flame 4 2 6 Installation Place 4 2 7 Cooling Performance 4 2 8 Clean or Maintenance 4 2 9 Cleaning 4 2 10 Expert Engineer Requi...

Page 3: ...13 8 3 Installation Hole 14 8 4 Lift product 14 9 Power on testing 16 9 1 safety testing 16 9 2 Power on procedure 16 9 2 1 External power supply 16 9 2 2 Switch off power 16 9 2 3 Display status tes...

Page 4: ...etc 1 2 Content This manual is introduction for 55SOA25PT include structure technical parameters installation usage maintenance as well as troubleshooting 1 3 Operation instructions Please make sure...

Page 5: ...Flame Do not install it nearby open flame area and no fire closed to the display 2 6 Installation Place Please follow the instructions and install it firmly on the ground or bracket to prevent any LC...

Page 6: ...sonal injury 3 Power cable The power cable is 3 meters if no particular request The cable is placed in the bottom of cabinet under display Customer can use or change different cable length as per need...

Page 7: ...Hisense B2B 6 4 Overall size mm Power Cable...

Page 8: ...on 1080 1920 Brightness 3000cd m2 Viewing angle 178 Contrast ratio 3000 1 IP rating IP65 Cooling system Air conditioner Working temp 40 50 Working Humidity 5 100 Working Voltage 220V 10 50HZ Consumpti...

Page 9: ...Hisense B2B 8 6 2 2D View 6 3 Door opening 6 4 Structure inside Step 1 Step 2 Step 3 Door for A C Rear door Speaker LCD Installation hold Eyebolt...

Page 10: ...6 5 Cable entrance hole Fan Power Timer A C LCD Switch 3 cable entrance hole for A C power cable external power cable and LAN cable Cable entrance hole for LAN Power cable Android board Power Socket R...

Page 11: ...se B2B 10 7 A C Installation 7 1 A C Removal 7 1 1 Open the A C door 7 1 2 Disconnect power cable to A C 7 1 3 Take out A C Unscrew and remove covere A C Draw out tray and take out A C Turn the rocker...

Page 12: ...Hisense B2B 11 7 1 4 Draw out tray and take out A C 7 2 A C installation 7 2 1 Put A C in the tray and fix it by rocker 7 2 2 Connect power cable to A C as below Tray Rocker...

Page 13: ...Caution before installation 8 1 1 Installation Place Environment This is floor standing mount ensure the concrete must be solid and we propose custom concrete foundation No less than 300mm No less tha...

Page 14: ...low to custom concrete foundation the overall size should be larger than base plate size recommended depth of concrete 400mm podium 20mm please make cable entrance hole in 8 2 2 Cable Pre embedded cab...

Page 15: ...y and solid make 8x installation hole in ground by M16 drill 8 4 Lift product Use crane or other tool to lift up product to the concrete and align to installation hole in concrete make sure the reserv...

Page 16: ...Hisense B2B 15 Step 1 Step 2 After installation remove 4 eyebolts and replace it with rubber plug Step 3 Anchoring by dynabolt Install 4 eyebolt Cross like this dynabolt Dynabolt into concrete...

Page 17: ...be implemented under the guidance of professional electrical engineer with multi meter 9 2 Power on procedure 9 2 1 External power supply Make sure voltage of power supply is compatible with the produ...

Page 18: ...r conditioner cooling when inside temperature up to a certain degree the A C will start working please clean the mesh in air vent after long time running 11 Media player Android media player 2G 16G wi...

Reviews: