Hisense 55SOA25PT User Manual Download Page 16

 

Hisense B2B

 

 

 

15

 

Step 1: 

 

 
 
 

             

 

 
 
 
 
 
 

Step 2: 

After installation, remove 4 eyebolts and replace it with rubber plug.

 

 

Step 3

: Anchoring by dynabolt

 

           

 

 
 

 

 

Install 4 eyebolt

 

Cross like this

 

 

dynabolt

 

Dynabolt into concrete

 

Summary of Contents for 55SOA25PT

Page 1: ...2021 55SOA25PT Issue Date 03 09 2021 Copyright 2021 All Rights Reserved User Manual Outdoor Series Beyond An Immersive Experience...

Page 2: ...on 3 2 2 Power Voltage 4 2 3 Avoid Water 4 2 4 No Touch 4 2 5 Avoid Open Flame 4 2 6 Installation Place 4 2 7 Cooling Performance 4 2 8 Clean or Maintenance 4 2 9 Cleaning 4 2 10 Expert Engineer Requi...

Page 3: ...13 8 3 Installation Hole 14 8 4 Lift product 14 9 Power on testing 16 9 1 safety testing 16 9 2 Power on procedure 16 9 2 1 External power supply 16 9 2 2 Switch off power 16 9 2 3 Display status tes...

Page 4: ...etc 1 2 Content This manual is introduction for 55SOA25PT include structure technical parameters installation usage maintenance as well as troubleshooting 1 3 Operation instructions Please make sure...

Page 5: ...Flame Do not install it nearby open flame area and no fire closed to the display 2 6 Installation Place Please follow the instructions and install it firmly on the ground or bracket to prevent any LC...

Page 6: ...sonal injury 3 Power cable The power cable is 3 meters if no particular request The cable is placed in the bottom of cabinet under display Customer can use or change different cable length as per need...

Page 7: ...Hisense B2B 6 4 Overall size mm Power Cable...

Page 8: ...on 1080 1920 Brightness 3000cd m2 Viewing angle 178 Contrast ratio 3000 1 IP rating IP65 Cooling system Air conditioner Working temp 40 50 Working Humidity 5 100 Working Voltage 220V 10 50HZ Consumpti...

Page 9: ...Hisense B2B 8 6 2 2D View 6 3 Door opening 6 4 Structure inside Step 1 Step 2 Step 3 Door for A C Rear door Speaker LCD Installation hold Eyebolt...

Page 10: ...6 5 Cable entrance hole Fan Power Timer A C LCD Switch 3 cable entrance hole for A C power cable external power cable and LAN cable Cable entrance hole for LAN Power cable Android board Power Socket R...

Page 11: ...se B2B 10 7 A C Installation 7 1 A C Removal 7 1 1 Open the A C door 7 1 2 Disconnect power cable to A C 7 1 3 Take out A C Unscrew and remove covere A C Draw out tray and take out A C Turn the rocker...

Page 12: ...Hisense B2B 11 7 1 4 Draw out tray and take out A C 7 2 A C installation 7 2 1 Put A C in the tray and fix it by rocker 7 2 2 Connect power cable to A C as below Tray Rocker...

Page 13: ...Caution before installation 8 1 1 Installation Place Environment This is floor standing mount ensure the concrete must be solid and we propose custom concrete foundation No less than 300mm No less tha...

Page 14: ...low to custom concrete foundation the overall size should be larger than base plate size recommended depth of concrete 400mm podium 20mm please make cable entrance hole in 8 2 2 Cable Pre embedded cab...

Page 15: ...y and solid make 8x installation hole in ground by M16 drill 8 4 Lift product Use crane or other tool to lift up product to the concrete and align to installation hole in concrete make sure the reserv...

Page 16: ...Hisense B2B 15 Step 1 Step 2 After installation remove 4 eyebolts and replace it with rubber plug Step 3 Anchoring by dynabolt Install 4 eyebolt Cross like this dynabolt Dynabolt into concrete...

Page 17: ...be implemented under the guidance of professional electrical engineer with multi meter 9 2 Power on procedure 9 2 1 External power supply Make sure voltage of power supply is compatible with the produ...

Page 18: ...r conditioner cooling when inside temperature up to a certain degree the A C will start working please clean the mesh in air vent after long time running 11 Media player Android media player 2G 16G wi...

Reviews: