2
Pre-Installation
Important Site Instructions
The installation, commissioning, inspection, maintenance and repairs must only be
carried out by a qualified person.
All electrical wiring must be completed by a licensed electrical contractor in
accordance with the appropriate standards.
The drilling work requires a permit from your local council.
The heating system and heat source must be properly designed and dimensioned
to ensure an efficient operation. It is particularly important to keep water flow
temperatures as low as possible.
The minimum heating water flow rate through the heat pump must be assured in
all operating states of the heating system.
Movement and storage
The unit must not be transported, moved or stored at greater than a 30° angle from the
upright position. Install and store the unit in a dry area. They are not rated for outdoor
use.
Safety
If a refrigerant leak occurs, remove the complete charge using a recovery unit and
store the refrigerant in mobile container.
Note: care is to be taken as the refrigerant can breakdown due to high temperature,
these refrigerants by-products are dangerous.
Once the leak has been repaired recharge the unit with the correct filling weight and
the type found on the unit’s nameplate.
Pre-Installation