Part No. 4801-1015 Rev 6-09
Super-Saver XL Heater – 120 Volt
Page
6
of
25
4. Installation
4.1 Hanging The Heater
Chain Suspension
Cable Suspension
Mount the heater with screw hooks and chains so that
the back of the heater is at least 12 inches (305 mm)
from the ceiling and wall. The heater must be a
minimum of 20 inches (500 mm) from floor, and
located so that livestock and combustible materials
are unable to come in contact with heater or within 10
ft (3 meters) of the hot air discharge.
If frequent height adjustment is required, use
cables and pulleys. Main line cable would be
connected to a winch.
4.2 Directions for Leveling
Adjust cables or chains as required
to level the heater. Use a
carpenter's level to check that the
heater is level.
4.3 Installing
Dual-Flare
Duct
Fold Dual-Flare duct to shape as
shown in Fig. 1. Install Dual-Flare
duct to heater exhaust (Fig. 1) as
shown with sheet metal screws
provided. This provides a multi-
directional heat flow that may be set
by bending flaps.
4.4 Connecting the Gas Supply
For gas connection (Fig. 2) attach
regulator to the Hi-Pressure Line (A)
at outside of building. Connect
flexible hose (B) to low pressure end
of regulator with special brass
coupling. See page 1 for LP, and
natural gas requirements.
Fig. 2
A
B
High Pressure
Line
Gas Regulator
Flexible
hose
Fig. 2
Attach Flare
Duct To
Heater With
Sheet Metal
Screws
Adjust Flap To
Direct Heat Flow
Flare Duct
Fig. 1