![HiP 25D815 Instructions-Parts List Manual Download Page 11](http://html.mh-extra.com/html/hip/25d815/25d815_instructions-parts-list-manual_2137629011.webp)
Operation
3A6828B
11
Operation
Pressure Relief Procedure
Follow the Pressure Relief Procedure whenever
you see this symbol.
1. Press the Stop
button on the controller display
to ensure the PT2020 controller is in an Off state.
2. Close the master pneumatic valve (C).
3. Close the fluid supply valve (P).
4. Bleed the pressure by opening the user-supplied
fluid pressure relief valve (J).
This equipment stays pressurized until pressure is
manually relieved. To help prevent serious injury from
pressurized fluid, such as skin injection, splashing
fluid and moving parts, follow the Pressure Relief
Procedure when you are finished operating the pump,
and before cleaning, checking, or servicing the
equipment.
Summary of Contents for 25D815
Page 32: ...Dimensions 32 3A6828B ...