13
CASE INSTALLATION
DRAIN and PUMP SET-UP
1.
1. The shipped-loose evaporation pan gets installed at
the rear left top of case. Cut away an excess section (18”
to 24” typical) of the plastic tubing for use in laterstep.
2.
Hook “V” of metal cover under
fl
ange and rotate cover
onto pan.
3.
Install platic bushing in cover. Place tube (from pump)
through bushing to grip and into pan.
4.
Place end of tube into cut-out section of cover, so that
pumped condensate water is directed into the pan.
5.
Place the short (18”) section of tubing onto the over-
fl
ow tube of the pan, and direct the tube to the rear
back of the case. (In event of components wearing out
in future, water will be directed to the
fl
oor rather than
collecting on the case top).
6.
Fasten pan to the case with #8 screws provided.
Summary of Contents for JNRBHSA
Page 2: ...ii ...
Page 33: ...B2 SEISMIC BRACKETS 5 BRACKETS ...
Page 34: ...C1 SPORLAN PRESSURE TEMPERATURE CHART ...
Page 38: ...Display Cases 5XIILQ 0LOO 5RDG RORQLDO HLJKWV 9 E3 ELECTRICAL WIRING DIAGRAM ...
Page 39: ...Display Cases 5XIILQ 0LOO 5RDG RORQLDO HLJKWV 9 E4 ELECTRICAL WIRING DIAGRAM ...
Page 46: ...G1 FASCIA FRAME ...
Page 47: ...G2 FASCIA FRAME ...
Page 48: ...G3 FASCIA FRAME ...
Page 49: ...G4 FASCIA FRAME ...
Page 50: ...G5 FASCIA FRAME OPTIONAL MOTION SENSOR INSTALLATION ...
Page 51: ...G6 FASCIA FRAME OPTIONAL MOTION SENSOR INSTALLATION ...
Page 53: ...G8 FASCIA FRAME JNRZHSA 5 BALLOON GUARD INSTALLATION ...
Page 55: ...I1 CASE LIFTING LOCATIONS Base Frame Lifting Locations for Forklift JNRBHSA JNRZHSA ...
Page 56: ...I2 CASE LIFTING LOCATIONS Base Frame Lifting Locations for Forklift JNRBHSA JNRZHSA ...
Page 57: ...v Ϯ Z Ͳ ϱ Z EZ v Ϯ Z Ͳ ϰ Z EZ v ϱ EZ J1 CONDENSING UNIT LOCATIONS ...