
4.3 Battery Backup Circuit Board
Chapter 4: Removal, Replacement, and Adjustment Procedures
Page 4 - 14
™ Bed Service Manual (man241)
9. Disconnect the battery cable (D), output cord (E), and power cord (F) from
the circuit board (H).
10. Using the phillips head screwdriver, remove the screw (G) and separate the
circuit board (H) from the battery box (C).
Replacement
1. Install the circuit board (H) on the circuit board supports (I) in the battery
box (C), and secure it with the screw (G).
2. Connect the battery cable (D), output cord (E), and power cord (F) to the
circuit board (H).
3. Install the battery box cover (B) on the battery box (C), and using the T25
Torx® head screwdriver, secure it with the screws (A).
4. Connect the battery backup box by plugging the battery cable into the main
bed control board (see “Battery Backup Box” on page 4-8).
5. Install the control board box cover (see “Control Board” on page 4-5).
6. Untie the foot section of the sleep surface, and carefully lower it back
down.
7. If applicable, install the mattress on the bed.
8. Plug the bed into an appropriate power source.
WARNING:
Powered bed mechanisms can cause serious injury. Operate the bed
only with persons clear of mechanisms.
9. Test the bed functions to ensure they are working properly.
Adjustment
None
Summary of Contents for Century+ P1400
Page 5: ...Revisions Page iv Century Bed Service Manual man241 NOTES...
Page 17: ...Chapter 1 Introduction Page 1 4 Century Bed Service Manual man241 NOTES...
Page 47: ...Chapter 2 Troubleshooting Procedures Page 2 2 Century Bed Service Manual man241 NOTES...
Page 115: ...Chapter 3 Theory of Operation Page 3 2 Century Bed Service Manual man241 NOTES...
Page 191: ...Warranty Chapter 5 Parts List Page 5 4 Century Bed Service Manual man241 NOTES...
Page 195: ...Exchange Policy Chapter 5 Parts List Page 5 8 Century Bed Service Manual man241 NOTES...
Page 198: ...Base Module Chapter 5 Parts List Century Bed Service Manual man241 Page 5 11 5 NOTES...
Page 206: ...Frame Surface Module Chapter 5 Parts List Century Bed Service Manual man241 Page 5 19 5 NOTES...
Page 210: ...Hilow Drive Assembly Chapter 5 Parts List Century Bed Service Manual man241 Page 5 23 5 NOTES...
Page 249: ...Chapter 6 General Procedures Page 6 2 Century Bed Service Manual man241 NOTES...
Page 263: ...Chapter 7 Accessories Page 7 2 Century Bed Service Manual man241 NOTES...
Page 274: ...Schematic Wiring Diagram Wiring Diagram Label Back to Chapter 3...
Page 275: ...Schematic Wiring Diagram Bed Exit II General Schematic Back to Chapter 3...
Page 276: ...Schematic Wiring Diagram Control Board Back to Chapter 3...
Page 277: ...Schematic Wiring Diagram Night Light P C Board Wiring Diagram Back to Chapter 3...