Sliding gate opener SLG5280X user manual(SL0720)
12
5. Control board wiring
5.1
The opener should be install on the left side of the sliding door because it is set as clockwise
when delivery . If needs to install on the right side of the sliding door ,the DIP switch 3 should be
changed into the opposite side.
5.2
Disconnect the power and connect the wires by professionals
5.3
Open the top cover of the motor, and connect the wires according to the following figure (user
just connects the interfaces of AC input, flash lamp, external control switch, photocell and
24VAC output),then install the top cover again after debugging.
5.4
Controller wiring instructions
5.4.1
Flash lamp interface: for connecting the flash lamp (220VAC), it only work during operation.
5.4.2
The Photocell switch interface: for connecting the infrared
protection switch (infrared switch NC contact) and 24VAC can be used as power supply. If
you do not use the infrared protection interface, then you need to make the terminal
shorted connect (Shorted in factory).