![HIKVISION DS-PF-E0204 Series Product Instruction Download Page 25](http://html1.mh-extra.com/html/hikvision/ds-pf-e0204-series/ds-pf-e0204-series_product-instruction_2133812025.webp)
24
Unscrew the upper
two nuts on the high
conductivity
wire,
tighten the first nut,
and then tighten the
second one.
Tensioner be placed during the installation of end posts to tighten the high conductivity wire
between two end posts. In order to ensure the tightening of high conductivity wire, it should take
expansion and contraction into consideration, that is, looser in summer and tightener in winter.
Tensioner tilt to the one side to form a straight line of high conductivity wire, so as to achieve the
effect of beauty, as is shown in fig:
⑥
Strainer
Put high conductivity wire into
three holes in order to form a
straight line.
It is beautiful to maintain a vertical
line or a slash between the upper and
lower of strainers.
⑦
Lightning d
el
iverter
Fixed on the mounting bracket with its nuts firstly, lightning d
el
iverter
each zone installs
one.
Grounding principles: the ground point is generally at the end of the electric fence, but the
ground point of lightning arrest should be altered to the beginning if a lightning d
el
iverter is
installed in the perimeter. High voltage and lightning d
el
iverter should be good grounding with a
ground resistance lower than 10
Ω
. The ground point of high and weak voltage should be
separated with a distance no less than 4 m.
DS-PF-E0204 Series Energizer User Manual
Summary of Contents for DS-PF-E0204 Series
Page 1: ...Product Instruction Energizer ...
Page 20: ...Diagram of GCS 19 DS PF E0204 Series Energizer User Manual ...
Page 34: ......