If the core does not fit the pattern (wound wrong), do not
try to make it work, strip the wire and wind it again correctly.
Spread the windings equally about the core using the clock
code.
Core Installation
Install L1-L2 last because of the size (see picture for detail).
Install L3-L13. Pull the leads tight. Align the core vertical
and solder.
Repeat for each inductor one by one. Solder as you go.
Install
Switch Assembly
Insert the switch on the top side of the assembly. Make sure
the leads are flush with the board. Install
Connector Assembly
Insert J1 and J2. Make sure the parts are flush and vertical.
Solder one pin to start, reheat while making final alignment.
Solder the remaining pins. Make sure the friction tab is in the
position shown below. The J1 tab is to the right and the J2 tab
is down in the drawing below. Install
Insert JR1. This component is installed from the back side of
the circuit board and soldered on the top side. It will only fit the
pattern one way. See picture below. Solder. Install
Summary of Contents for PackerAmp V4
Page 65: ...APPENDIX A www hfprojects com vstamps comcast net 281 467 9424 ...
Page 76: ......