background image

 

IMPORTANT DECLARATIONS 

 

Copyright © 2018 Heyuan Intelligence Technology Co., Ltd All Rights Reserved  
 
This manual may not be reproduced, copied, transmitted or transcribed in whole or in part 
by  any  means  without  the  expressed  written  permission  of  Heyuan.  Any  shall  be 
investigated  for  legal  responsibility  in  violation  of  copyright  or  other  intellectual  property 
rights  of  the  Company.  We  check  the  user  manual’s  contents  regularly  and  will  make 
necessary  amendments  in  next  version.  Welcome  to  give  advice  for  some  unexpected 
errors. The rights of upgrading without notice are reserved. 
 
Please  read  this  manual  carefully  before  the  product  is  operated.  And  once  you  start 
operating the meter, you’ll be considered to have read this manual and accept all our terms. 
Heyuan shall not be responsible or liable for any damages or injuries caused by improper 
meter installation and/or operation. 
 
Attention: the following symbols in this manual refer to meanings as follows  

   

Electric  Shock  Symbol:  Carries  information  about  procedures  which  must  be 

followed to reduce the risk of electric shock and danger to personal health   

    

Safety  Alert  Symbol:  Carries  information  about  circumstances  which  if  n ot 

considered may result in injury or death 
 

The  meter  must  be  installed  and  operated  by  one  who  has  experience  with  high -voltage 
devices or has qualifications. Please connect the meter to correct voltage before operating 
the meter. Please install and use the meter according to the user manual. Heyuan shall not 
be  responsible  or  liable  for  any  damages  or  injuries  caused  without  following  the 
instructions in the user manual. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Summary of Contents for DZS100-4P

Page 1: ...DZS100 4P Single Phase Energy Meter User Manual Heyuan Intelligence Technology Co Ltd...

Page 2: ...ered to have read this manual and accept all our terms Heyuan shall not be responsible or liable for any damages or injuries caused by improper meter installation and or operation Attention the follow...

Page 3: ...2 Technical Parameters 1 Chapter 3 Dimension Wiring 2 3 1 Dimension 2 3 2 Terminals Wiring 2 Chapter 4 Communication Interface 3 Chapter 5 Meter Display Operation 3 5 1 Operation and Buttons 3 5 2 Dig...

Page 4: ...e current power frequency power factor and active energy Compatible with DL T645 2007 DL T645 1997 and Modbus RTU protocols Chapter 2 Specification Technical Parameters 2 1 Specification the following...

Page 5: ...ed 5 40 A 10 80 A wiring diagram directly connected Chapter 4 Communication Interface The meter is equipped with one communication interface The settable baud rates of RS485 communication are 1200bps...

Page 6: ...ted into hexadecimal whose last two digits are the Modbus communication protocol address For example if the bar code is 170510300920 the communication protocol address is 98 hexadecimal 152 decimal Ch...

Page 7: ...gure 1 LCD Display Interface Reference Diagram LCD Display Description LCD Display Description Password 3366 Import Energy High 6 digit for DL T645 Export Energy Low 6 digit for DL T645 Voltage Baud R...

Page 8: ...t according to actual situation will be charged Service Guarantee 1 Product technical consulting and quality complaints will be replied within 12 hours 2 Solutions for quality complaints will be provi...

Reviews: