background image

 

                                                                                                                                                                                                         

5.2 Installation

 

5.2.1 Inspection Before Installation

 

Generally,  open-case  inspection  is  forbidden  because  ASDU-LS  Intelligent  Gateway  is  well 
manufactured  and  highly  integrated  without  any  adjustable  devices.  Before  power  supply,  it  is 
required to check whether the device and appearance are intact or not, whether terminals are tight 
or  not,  whether  parameters  labeled  on  nameplate  comply  with  the  requirements  or  not,  whether 
power connection is correct or not, whether input voltage is correct or not.

 

 

5.2.2 Power-on Inspection 

 

ASDU-LS Intelligent Gateway will start working once it is power on. The power indicator light “PWR” 
lights up and the run light “RUN” flashes regularly, which shows power is correctly on and ASDU-LS 
is working normally.

 

Chapter 6 Key Performance Indicator

 

6.1 Capacity for ASDU-LS Intelligent Gateway

 

Item

 

Unit

 

System Capacity

 

Quantity of Connected Smart 

Devices

 

quantity of simultaneously 

connected smart devices for 

each communication interface

 

set

 

32

 

Historical Data Storage Capacity

 

historical data storage time

 

day

 

7

 

 

6.1 System Reliability Indicators

 

Item

 

Unit

 

System Parameters

 

Telemetry Accuracy

 

%

 

100

 

Telecontrol Accuracy

 

%

 

100

 

Energy Accuracy

 

%

 

100

 

Control and Operation Accuracy

 

%

 

100

 

Mean Time Between Failures

 

h

 

≥20000

 

 

Chapter 7 Running Configuration Requirement 

 

7.1 Hardware Environment Requirement

 

7.1.1 Intelligent Gateway Programs: Minimum Configuration List

 

No.

 

Item

 

Configuration Parameters

 

1

 

CPU

 

single-core Cortex-A7, 500MHz

 

2

 

Memory

 

256MB DDR3

 

3

 

Disk

 

2GB EMMC

 

4

 

Network Card

 

2* independent Ethernet

 

 

7.1.2 Host Computer Programs: Minimum Configuration List

 

No.

 

Item

 

Configuration Parameters

 

1

 

CPU

 

13 2GHz

 

2

 

Memory

 

2G

 

Summary of Contents for ASDU-LS

Page 1: ...ASDU LS Intelligent Gateway User Manual V1 1 Heyuan Intelligence Technology Co Ltd...

Page 2: ...served Please read this manual carefully before the product is operated And once you start operating the product you ll be considered to have read this manual and accept all our terms Heyuan shall not...

Page 3: ...ter 5 Dimension Installation 4 Chapter 6 Key Performance Indicator 5 Chapter 7 Running Configuration Requirement 5 Chapter 8 First Time to Configure 6 Chapter 9 Database Setting 7 Chapter 10 Device Ma...

Page 4: ...d processor of the integrated automation system to form the middle layer of the automatic system It can communicate upward with each system such as master station and communicate downward with the ter...

Page 5: ...umption 15W 3 4 Software Configuration Linux 4 1 Embedded various communication protocols Modbus RTU Protocol Modbus TCP IP Protocol DL T 645 Protocol IEC60870 102 103 104 Protocol MQTT Protocol HTTP...

Page 6: ...ial and CAN Ports 4 isolated RS485 interfaces 1 isolated CAN interface No Item Function 1 A1 1st RS485 communication 2 B1 3 A2 2nd RS485 communication 4 B2 5 A3 3rd RS485 communication 6 B3 7 A4 4th R...

Page 7: ...y Power Supply DC8 36V connected to the negative pole of power supply connected to the positive pole of power supply Chapter 5 Dimension Installation 5 1 Dimension A Din rail Mounting Dimension Unit m...

Page 8: ...s working normally Chapter 6 Key Performance Indicator 6 1 Capacity for ASDU LS Intelligent Gateway Item Unit System Capacity Quantity of Connected Smart Devices quantity of simultaneously connected s...

Page 9: ...192 168 138 1 automatically Use a network cable to connect ETH1 Ethernet interface 1 of the gateway with computer On computer add an IP address192 168 137 XX XX ranges from 2 to 255 and then connect...

Page 10: ...r and About which respectively refer to the system setting interfaces real time data monitoring interfaces and copyright information of the gateway Tool Bar including save button add record button del...

Page 11: ...t Configuration In the navigation bar choose Terminal Model Sheet Click buttons in the tool bar to add or delete terminal models and edit the details Screen 9 3 Terminal Model Sheet Configuration Regi...

Page 12: ...n that is real time data readout data terminal scale 9 3 3 Terminal Energy Register Table Configuration Click buttons in the tool bar to add or delete terminal energy registers and edit the details Sc...

Page 13: ...nergy registers and edit the details Screen 9 6 Terminal Digital Signal Register Table Configuration Digital Signal Type Single Point Digital Signal Double Point Digital Signal 9 3 5 Terminal Setting...

Page 14: ...ons of 101 acquisition and forwarding protocol 103 acquisition protocol 104 acquisition and forwarding protocol Modbus acquisition and forwarding protocol 1997 2007 DL 645 protocol and CJ T188 protoco...

Page 15: ...a 2 Edit Inquiry Frame Screen 9 11 MODBUS RTU Acquisition Protocol Inquiry Frame Editing The Edit Inquiry Frame interface is used to configure the telemetry data energy data and digital signal data a...

Page 16: ...ype and endianness etc Screen 9 13 Energy Details Editing of MODBUS RTU Acquisition Protocol Inquiry Frame Edit energy names register address data type and endianness etc a 3 Edit Control Frame Screen...

Page 17: ...15 Details Editing of MODBUS RTU Acquisition Protocol Telecontrol Frame b MODBUS RTU Forwarding Protocol Configuration Screen 9 16 MODBUS RTU Forwarding Protocol Configuration c 1997 DL 645 Protocol C...

Page 18: ...68 01 02 11 B6 03 16 Address 030000000000H Control Code C 01H Identification Code DI1DI0 B611H Data Length 02H Receive original message 68 03 00 00 00 00 00 68 81 04 44 E9 33 34 EC 16 Message after De...

Page 19: ...68 61 01 00 00 00 00 68 11 04 00 01 01 02 17 16 Address A0 A5 610100000000H Control Code C 11H Identification Code DI3DI2DI1DI0 02010100H Data Length 04H Send original message 68 61 01 00 00 00 00 68...

Page 20: ...007 DL 645 Protocol Configuration e 101 Acquisition Protocol Configuration Screen 9 21 101 Acquisition Protocol Configuration f 101 Forwarding Protocol Configuration Screen 9 22 101 Forwarding Protoco...

Page 21: ...isition Protocol Configuration Screen 9 23 103 Acquisition Protocol Configuration h 104 Acquisition Protocol Configuration Screen 9 24 104 Acquisition Protocol Configuration i 104 Forwarding Protocol...

Page 22: ...19 Screen 9 25 104 Forwarding Protocol Configuration j CJ T188 Water Meter Protocol Configuration Screen 9 26 CJ T188 Water Meter Protocol Configuration...

Page 23: ...ater Meter Protocol Details Configuration 9 4 2Communication Channel Configuration Screen 9 28 Communication Interface Details Configuration Configure the information of serial ports 9 4 3Communicatio...

Page 24: ...n of connected terminals 9 4 4Front end Communication Sheet The sheets of front end communication telemetry energy digital signal setting value telecontrol will be automatically generated based on the...

Page 25: ...ration 9 5 2Forwarding Channel Configuration Screen 9 31 Forwarding Channel Configuration 9 5 3 Forwarding Terminal Configuration In the communication terminal sheet the communication interface is the...

Page 26: ...nt 10 1 Communication Configuration 10 1 1 Local Communication Parameter Configuration The local communication parameter configuration is used for debugging when the gateway is directly connected to t...

Page 27: ...U LS equipped with 4G function On interface Device Management choose Cloud Communication Parameter Configuration and fill cloud service IP address and gateway details Screen 10 2 Cloud Communication P...

Page 28: ...Configuration and Program Upgrading Package Please choose the corresponding file type and path and then click send file 10 4 File Calling Screen 10 5 Calling File The Database File Configuration File...

Page 29: ...FDT C1 2 DZS100 JFDT C1 2 DZS100 2 DZS100 JFDT C1 2 DZS100 2 DZS100 2 DZS100 2 DZS100 JFDT C1 JFDT C1 JFDT C1 DZS300 2 DZS100 JFDT C1 DZS300 ASDU001 ASDU002 ASDU006 ASDU005 AL20 AL21 AL23 AL24 AL25 AL...

Page 30: ...e cost according to actual situation will be charged Service Guarantee 1 Product technical consulting and quality complaints will be replied within 12 hours 2 Solutions for quality complaints will be...

Reviews: