![hestan KRD304-LP Installation Manual Download Page 12](http://html1.mh-extra.com/html/hestan/krd304-lp/krd304-lp_installation-manual_2127528012.webp)
EN
©2019 Hestan Commercial Corporation
10
LOCATION AND INSTALLATION/VENTILATION
(CONTINUED)
INSTALLATION CLEARANCES WITH ISLAND TRIM
SIDE VIEW
FINISHED
FLOOR
38-3/8 - 36-3/4”
[97.5 - 93.4]
TO COOKING
SURFACE
48-5/16”
[122.7]
DIMENSIONS IN BRACKETS [ ] ARE IN CM.
LOCATION OF GAS
AND ELECTRICAL
ON FLOOR
ISLAND
TRIM
For Island Trim installations,
counter surface should
have a cantilever surface
meeting the rear of
the Island Trim
MIN. CLEARANCE
TO COMBUSTIBLE
SURFACES WITH
ISLAND TRIM
COMBUSTIBLE
MATERIALS
30-13/16”
[78.3]
24-11/16”
[62.7]
12”
[30.5]
3”
[7.6]
MAX.
RECESS
DEPTH
SURFACE
APPLIANCE
TOP
COOKING