
14
Installation procedures
Anchor bolt installation.
① Drill a hole (ⓓ: hole depth)
② Clean the inside of the hole
③ Put the anchor bolt into the hole
and hammer in until it reaches the
bottom of the hole
④ Tighten the bolt with a spanner.
(ⓐ35~45mm)- Torque : 80~100N.m
■Fixation horizon of the base
▶After adjust horizon of the product
precisely, fix up using anchor bolt.
After measure the horizontal status, lay
down the lie.
Adjustment the level of the base.
1
After adjust the level, fix up the base
platform using anchor.
Fixation of base (anchor)
2
■ Landing down the product at the place to be installed
▶Place the lift main body at the place to be installed referring to layout document.
▶Fixing the product after checking the caution notes.
In case of the
forklift use
In case of the
crane use
■Fixing the base with anchor bolt
▶Fix the 6pcs Anchor bolt of the
base plate and 2pcs Anchor bolt of
the control panel after supporting lift
using liner.
Installation
Installation
Summary of Contents for HL-32X
Page 10: ...7 Caution Sticker layout Caution Warning Danger Introduction Introduction...
Page 11: ...8 Heshbon Lift Capacity Heshbon logo Heshbon symbol Hand Foot Warning Introduction...
Page 22: ...19 MEMO Installation Installation...
Page 27: ...24 TROUBLE SHOOTING Maintenance Maintenance...
Page 28: ...25 Check list and periodic maintenance Maintenance Maintenance...
Page 30: ...27 Platform Link...
Page 31: ...28 Base...
Page 32: ...29 Cylinder...
Page 33: ...30 Control Panel...
Page 34: ...31 Hydraulic Circuit...
Page 35: ...32 Electric Circuit...