HESHBON HL-26K Installation, Operation And Maintenance Manual Download Page 2

NO. 26K101101A
ⓒ Copyright Heshbon Co.,Ltd. HBS Project 2010 All rights reserved.

NOTE TO THE USER

Thank you for purchasing HESHBON CAR LIFT

Please read this instruction carefully for safety and proper use of the car lift, 

and retain it for future reference.

   This Manual is for model : HL-26K

   As for the assurance of safety in design and construction 

   of car lift, read this Manual first.

   Please make sure that this Manual is delivered to end users 

   for their implementation of safety.

   Don’t use the car lift in a potentially explosive atmosphere.

ANY PART OF THIS PRINT MUST NOT BE REPRODUCED IN ANY FORM 

WITHOUT PERMISSION.

THIS PRINT IS SUBJECT TO CHANGE WITHOUT NOTICE.

Summary of Contents for HL-26K

Page 1: ...his manual before you get started You must read and understand the precautions for safety purposes and any damages that may occur to your property HESHBON2POSTLIFT Installation Operation Maintenance M...

Page 2: ...t for future reference This Manual is for model HL 26K As for the assurance of safety in design and construction of car lift read this Manual first Please make sure that this Manual is delivered to en...

Page 3: ...on 4 4 6 7 7 Installation Procedures Checklist Before Installing Place of Installation Layout 10 10 11 Safety Danger Warning Caution 8 8 Operation Check Points Before Operation Operation Operation Pro...

Page 4: ...der Arm lock gear Introduction Door protection rubber Remote controller makes working more convenient Remote controller Option Upper limit protection bar A limit bar prevents the vehicle from being li...

Page 5: ...type cylinders ensure reliability and longevity Powerful arm lock gear At the bottom position the gears are unlocked to allow arm adjustment When the lift is raised the gears are automatically locked...

Page 6: ...pack Locker cover Locker inside Control panel Short arm 1 2 3 4 5 6 7 8 9 10 11 12 13 Slave post Industrial ram type cylinder Carriage Door protection rubber pad Long arm Pick up pad 1 2 3 4 5 6 7 13...

Page 7: ...L CAPACITY MAX PRESSURE MAX HEIGHT MIN HEIGHT STROKE LIFTING TIME LOWERING TIME POWER MOTOR NET WEIGHT MEASUREMENT HL 26K 4 000 Kg 220 Kgf 1 890 1 930 mm 90 130 mm 1 800 mm Approx 40 60 sec Approx 30...

Page 8: ...he rules are applied only to the manuals of Heshbon Co Ltd Do not come under the vehicle during operation It may cause severe injuries Evacuate to a safe place instantly in the event that the vehicle...

Page 9: ...carriages Before going under the lift make sure that the safety pawls are engaged To avoid being electrocuted disconnect the main power before opening the control panel Do not modify the control panel...

Page 10: ...an 2 3 of the bolt length Installation site To maintain the warranty the lift is intended for indoor installation only In the event that it is installed outside it should be protected from snow and ra...

Page 11: ...0 1930 90 130 Place of Installation Layout Check points before selecting the place of installation Distance from wall or any fixed object Drive on direction Positions of power post and slave post Ceil...

Page 12: ...ans of the shim plates provided Fix by anchor bolts Adjusting verticality Fixing the post 1 2 Connection of the hydraulic hose Before setting up the post connect the hydraulic hose and tighten it with...

Page 13: ...ate of the post when the lift descends and then tighten This cable until both carriages lest on lie base plates simultaneously Adjusting the cables How to check the tuning adjustment Check with naked...

Page 14: ...14 14 Installation Hydraulic line drawing Please refer to this for hydraulic line installation...

Page 15: ...15 Installation Please refer to this for electric line installation Electric line drawing...

Page 16: ...he ascent and descent lever operate correctly Hydraulic Check Check that there are no hydraulic leaks from either cylinders pipes or hose joints Mechanical Check Check the tightness of all nuts bolts...

Page 17: ...of gravity in line with the 2 posts Vehicle entry 3 Raise the lift approx 50mm and check visually and mechanically to ensure that each arm lock is firmly engaged Check the arm locks 5 Swing in the 4 a...

Page 18: ...d automatically Release the pick up pads from the pick up points by screwing down the telescopic threads Swing the arms from under the vehicle to the straight ahead position and remove the vehicle Veh...

Page 19: ...172 mm 120 26K Arm 2 section telescopic arm 971 mm 1560 mm 3 section telescopic arm 567 mm 852 mm 1077 mm The height of the pad can be adjusted 3 stages as shown below 3 stage telescopic pad adjustme...

Page 20: ...ce usage Clean the arm lock gears and surroundings lubricate the gear teeth and the release mechanisms Clean the safety lock pawls and lubricate the axles Synchronization Cable Adjustment Check that b...

Page 21: ...chanically so that spring pressure does not reengage them Remove the trolley jack and extension Repeat this operation on the opposite carriage Remove the trolley jack and extension As a safety precaut...

Page 22: ...nk Drain plug Pump filter Oil filter Oil discharge Oil change procedure Remove the cover of the hydraulic unit Remove the oil filter cap and dipstick Carefully remove the oil drain plug and allow the...

Page 23: ...23 Maintenance Troubleshooting...

Page 24: ...24 Check list and periodic maintenance Maintenance...

Page 25: ...HL 26K PART LIST Version 2 11 2010 25 This installation manual is prepared as of November 2010 This manual is subject to change without prior notice if the lift specificaion is changed...

Page 26: ...26 HL 26K Full Ass y 9 Control panel 8 Power units 7 Short arm 6 Long arm 5 Cylinder 2 Driven post 3 Carry 4 Upper support beam 1 Drive post...

Page 27: ...UP LIMIT SWITCH ANTI VIBRATED RUBBER POWER UNIT WIRE ROLLER PUSH BUTTON SWITCH KEY SWITCH PARTS LIST LOCK WIRE ROLLER DOWN LIMIT SWITCH SPRING PIN LOCK BLOCK LOCK SPACER WRENCH BOLT LEVER CONNECTOR PA...

Page 28: ...22 STEAL BALL 14 WRENCH BOLT M8 6 D U BEARING O RING BACK UP RING U PACKING BACK UP RING PARTS LIST HEAD COVER CYLINDER HOSE ADAPTER LOCKING BOLT M6 PISTON PARTS LIST FLAT WASHER M8 DOOR PROTECT RUBB...

Page 29: ...HEXA BOLT PARTS LIST WRENCH BOLT SPRING PIN GEAR SHAFT ARM LOCK SPRING SMALL ARM LOCK GEAR LARGE ARM LOCK GEAR ARM SHAFT PARTS LIST SHORT ARM SLIDE ARM 2 rd SLIDE ARM 3 rd LONG SLIDE ARM LONG ARM CAR...

Page 30: ...T WASHER 12 LIMIT SWITCH 6 HEXA NUT 11 WIRE ROLLER SPACER 5 HEXA BOLT UPPER LIMIT TOUCH BAR LIMIT SWITCH FIXTURE E RING PARTS LIST 10 9 8 7 NO WIRE ROLLER SNAP RING WIRE ROLLER SHAFT UPPER SUPPORT BEA...

Page 31: ...31 26MA00 31 HL 26K Hydraulic circuit...

Page 32: ...32 HL 26K Electric circuit...

Page 33: ......

Page 34: ...HESHBON CO LTD 673 52 GYEONGSEO DONG SEO GU INCHEON 404 170 KOREA TEL 82 32 585 3570 Int l trading FAX 82 32 585 3535 http www heshbon com e mail export heshbon com...

Reviews: