10
Installation site
Check List Before Installing
The site must be
flat and horizontal.
The floor must have
minimum 160mm
depth of reinforced
concrete.
Surface load under
the posts must be
minimum 25N/㎟
Ambient temperature
10℃ to 50℃. Do not
operate under
freezing conditions.
Installation site
Vehicle access to
the lift must be safe
and easy.
There must be a safe
working distance of
minimum 1m between
the lift and the wall or
any fixed object.
To ensure that the
anchor is secure, the
hole for an anchor
bolt must be more
than 2/3 of the bolt
length.
Installation site
To maintain the warranty, the lift is intended for
indoor installation only. In the event that it is
installed outside it should be protected from snow
and rain. Outdoor installation makes the warranty
invalid.
Skilled engineers of
Heshbon or its sale
representative agency
shall install the lift,
otherwise a failure may
occur.
The lift should be installed by skilled engineers either from Heshbon or from Heshbon's
appointed representatives. Failure to observe this makes the lift warranty invalid. If the lift
is to be moved to another site at a later date, it must be reinstalled by skilled engineers
either from Heshbon or from Heshbon's appointed representatives.
Installation
Summary of Contents for HL-26K
Page 14: ...14 14 Installation Hydraulic line drawing Please refer to this for hydraulic line installation...
Page 15: ...15 Installation Please refer to this for electric line installation Electric line drawing...
Page 23: ...23 Maintenance Troubleshooting...
Page 24: ...24 Check list and periodic maintenance Maintenance...
Page 31: ...31 26MA00 31 HL 26K Hydraulic circuit...
Page 32: ...32 HL 26K Electric circuit...
Page 33: ......