■Setting up a post
Anchor bolt installation
① Drill a hole
② Clean the inside of the hole
③ Put an anchor bolt into the hole and hammer
it until it reaches the bottom of the hole
④ Tighten the bolt with a spanner (ⓐ:35~45mm)
(Tighten more 80N.m~100N.m)
▶Before securing with anchor bolts, ensure
that the post is vertical in both directions.
Vertical balance
Check that the post is vertical in both
directions and adjust by means of the shim
plates provided.
Fix by anchor bolts.
Adjusting verticality
Fixing the post
1
2
■
Connection of the hydraulic hose
▶Before setting up the post, connect the
hydraulic hose and tighten it with a 19/17mm
spanner. Check for oil leakage.
Air bleeding
▶With an Allen key loosen the bleeding
screw in the top cover of each cylinder
until the oil flows out without air bubbles.
Retighten.
■Bleeding the cylinders
▶Make sure that all air is bled from the
cylinders. As the lift uses ram type cylinders,
recheck the bleeding operation after
completing installation
Make sure
air is bled in
a no-load
condition.
Installation
Summary of Contents for HL-26K
Page 14: ...14 14 Installation Hydraulic line drawing Please refer to this for hydraulic line installation...
Page 15: ...15 Installation Please refer to this for electric line installation Electric line drawing...
Page 23: ...23 Maintenance Troubleshooting...
Page 24: ...24 Check list and periodic maintenance Maintenance...
Page 31: ...31 26MA00 31 HL 26K Hydraulic circuit...
Page 32: ...32 HL 26K Electric circuit...
Page 33: ......