
1
Prepare and install the water inlets,
suggested center distance of hot and
cold water inlet pipe: 59"(150mm)
2
Install the fixed holder according to actual
dimensions.
Installation Steps
3
3
Assemble and connect the parts in the
sequence above.
4
Test the product when finishing the
installation.
130~170mm(5.1"~6.7")
900~1000mm(35.4"~39.4")