I
NSTALLATION AND
A
SSEMBLY
18
8.2 Assembly instruction HLS1200-61
No
.
HLS1200-61
Description
Material requirements
1
Packaging units
1x
Platform main body
1x
Cantilever set
2
Control packaging content Detailed assembly see
chapter additional
information
3
Screw in hose barb
1x
Hose barb 1/2"
4
Connect
platform-sided hose line
1x
Rubber hose 16mm
1x
Rubber hose 8mm
1x
Hose connector 6mm
2x
Hose clamp 10-16
1x
Hose clamp 16-25
5
Connect
platform-sided hose line.
Connect pneumatic line
(provided by the
customer)
1x
Operator control module
1x
Hose clamp 10-16
1x
Hose clamp 16-25
Summary of Contents for K1200-HLS-61
Page 2: ...2 ...
Page 42: ...ADDITIONAL INFORMATION 42 Dimensions installation pit HLS1200 64 66 ...
Page 43: ...ADDITIONAL INFORMATION 43 Dimensions substructure HLS1200 64 66 ...
Page 44: ...ADDITIONAL INFORMATION 44 Schematic diagram installation HLS1200 64 66 ...
Page 45: ...ADDITIONAL INFORMATION 45 Dimension sheet HLS 1200 61 ...
Page 46: ...ADDITIONAL INFORMATION 46 Dimension sheet HLS 1200 64 66 ...