background image

Before placing the product on the fixed Holder, the 

product insertion screws must be tightened in the 

down 

direction as shown in the figure. Do not place the product

without checking. Otherwise, the product will not sit, and

the elevator mechanism will be damaged if forced.

Place the product in its holder and press lightly. 

The click sound will come when the product 

is placed in the holder.

The holder should be installed to all prepared floor 

drainage indicated in the figure.

MOLELINE SERIES

Installation Guide

R

6

7

8

9

Wait for the concrete is freezing. The holder should be

stayed remain and protected for external factors.

Reviews: