background image

CSL
CSM
CSB

64

ELECTRICAL SUPPLY

Standard electrical supply for all Combi-Steamers is 208-240 volt, 3 phase, 50-60 Hz.

NOTE:

The power connections are located behind the service door (see section 5-3).

Each unit requires a separate fused service according to the following table: (3 phase only)

Model

Voltage

Phase

Amps

Load

CSL/M/B-6

208V

3

27

9.6KW

CSL/M/B-6

208V

1

46

9.6KW

CSL/M/B-6

240V

3

27

9.6KW

CSL/M/B-6

240V

1

40

9.6KW

CSL/M/B-10

208V

3

52

18.6KW

CSL/M/B-10

240V

3

45

18.6KW

CSL/M/B-1020

208V

3

88

31.5KW

CSL/M/B-1020

240V

3

76

31.5KW

CSL/M/B-20

208V

3

103

37.2KW

CSL/M/B-20

240V

3

90

37.2KW

CSL/M/B-40

208V

3

175

63KW

CSL/M/B-40

240V

3

152

63KW

NOTE:

When the oven is installed it must be electrically grounded in accordance with local codes, or in the absence of local

codes, with the National Electric Code, ANSI/NFPA 70-1990.

NOTE:

All connections must comply with the oven data plate.  A separate fused disconnect switch or circuit breaker

(not furnished) MUST be installed in the electrical supply line FOR EACH OVEN!

NOTE:

The electrical diagram is located behind the service door.

The electric supply terminal block, located behind the service door, is clipped on a mounting rail which is attached to the
frame of the unit.  The three phases of the power cord are connected to the three gray colored terminals.  Ground is con-
nected to the yellow-green terminal.

NOTE:

The phase sequence does not have to be observed because of the automatic reversing action of the fan motor.

CHANGES IN VOLTAGE

To change voltages of the Combi-Steamers (ex: 208 to 240 volt) the following has to be changed:

1) Air and steam elements

2) Contactor LS5

3) CSM and CSL units - the wires on the control panel transformer and the interior light transformer must be switched to 

the correct voltage terminals.

Do Not use conduit as a supply ground, or electrical shock could result.

Summary of Contents for B-1020

Page 1: ...e Back Side CSB CSM CSL 6 10 1020 6 150mm 2 50mm 2 50mm NOTE 14 350mm is recommended at the left side of the unit for service purposes Place the combi steamer on an original Henny Penny stand or on a...

Page 2: ...shing oven racks into unit The oven rack must be positioned vertically in the unit not tilting For minor unevenness in floor the oven rack can be leveled using the optional leveling device If necessar...

Page 3: ...70 1990 NOTE All connections must comply with the oven data plate A separate fused disconnect switch or circuit breaker not furnished MUST be installed in the electrical supply line FOR EACH OVEN NOTE...

Page 4: ...or local plumbing codes The unit has an integrated vented drain system which acts as a reverse flow check valve so it may be connected directly with a P trap to the drain system Installation Electric...

Page 5: ...ill provide easy loading and unloading without interfering with the final assembly of food orders Installation Gas Units Do Not puncture the cabinet with any objects such as drills or screws as electr...

Page 6: ...version The stacked version kit comprises two different draft hoods one with a single outlet and the second with a double outlet A flue riser completes the stacked version flue assembly Fix the singl...

Page 7: ...n integrated vented drain system which acts as a reverse flow check valve so it may be connected directly with a P trap to the drain system Should the water pressure exceed 87 psi a pressure regulator...

Page 8: ...all electrical connections are to be made in accordance with the CAN CGA B149 1 or 2 installation code and or local code and the Canadian electrical code Part 1 CSA C22 1 Before connecting incoming p...

Page 9: ...reates double bends causing work fatigue failure of the fittings In all installations where self draining is not necessary connect metal hose in a vertical loop DO NOT CONNECT METAL HOSE HORIZONTALLY...

Page 10: ...nces in the kitchen are on high flame The mini mum and maximum incoming line flow pressures should be as follows Natural 7 11 water column Propane 11 water column Installation Gas Units continued Neve...

Page 11: ...be taken by installing a gas pressure gauge on the front of the unit s main gas valves test port This should be done with all gas appliances in operation on the same gas supply line Should the manifol...

Reviews: