![HEMCO UniFlow CE Installation, Operation & Maintenance Manual Download Page 12](http://html.mh-extra.com/html/hemco/uniflow-ce/uniflow-ce_installation-operation-and-maintenance-manual_2123196012.webp)
12
HEMCO
Laboratory Planning Solutions
w
Fax (816) 796-3333
Tel (816) 796-2900
HEMCO Corporation
711 South Powell Road
Independence, MO 64056
R
(Left Upper Baffl e) is lifted into place. Secure lower
connection with provided #10 sheet metal screws.
(Center Upper Baffl e) is lifted into place. Secure lower
Connection with provided #10 sheet metal screws.
(Right Upper Baffl e) is lifted into place. Secure lower
connection with provided #10 sheet metal screws.
Install: (Right Side Wall Top #4) into escutcheon on
top of (Right Side Wall panels A & B)
13
HEMCO
Laboratory Planning Solutions
www.HEMCOcorp.com
Fax (816) 796-3333
Tel (816) 796-2900
HEMCO Corporation
711 South Powell Road
Independence, MO 64056
R
Install (Front Center Top #2) into Top Front wall
escutcheon.
Install (Left Top Panel #1) into Top Front wall
escutcheon.
Install (Right Side Wall Top #4) into Top Right Front
escutheon.
Install: (Left Side Wall Top #4) into escutheon on top
of (Left Side Wall panels A & B)