background image

7

INSTALLER DISPLAYS/SETTINGS

Step 1 

- Press SET CLOCK.

Step 2

 - Current Time (hour): Set the hour of the day using 

 or 

 buttons.  AM/

PM toggles after 12.  Press NEXT to go to step 3.

Step 3 

- Current Time (minutes): Set the minutes of day using 

 or 

 buttons.

Press NEXT to exit Set Clock.  Press REGEN to return to previous step.

Power Loss 

- If the power goes out for less than two hours, the system will

automatically reset itself.  If an extended power outage occurs, the time of day
will flash on and off which indicates the time of day should be reset.  The system
will remember the rest of the program settings.  Do not forget to reset for daylight
savings time.

SET TIME OF DAY

Figure 8

Step 1

 - Press NEXT and 

 simultaneously for 3 seconds.

Step 2 

Hardness: 

 Set the amount of total compensated hardness in grains

(hardness as calcium carbonate) per gallon using 

 or 

 buttons. The default is

20 with value ranges from 1 to 150 in 1 grain increments.  Note:  The grains per
gallon should be increased if soluble iron needs to be reduced.    Add 3 grains of
hardness for each ppm of iron present.  If this display shows nA -, then system is
either set-up in “time clock” or “filter” modes.  (See table 6, page 19).  Press NEXT to
go to Step 3.  Press REGEN to exit Installer Displays/Settings.

Step 3 - 

Day Override:

  This sets the number of days between regenerations.  If

value set to “oFF” regeneration initiation is based solely on gallons used.  If value
is set as a number (allowable range from 1 to 28) a regeneration initiation will be
called for on that day even if sufficient number of gallons were not used to call for
a regeneration.  Set Day Override using 

 or 

 buttons:

• number of days between regeneration (1 to 28); or
• “oFF”

NOTE:

 If softener is set up as a time clock system (ie: not meter initiated) this

value will be the days between regenerations.

See table 6, page 19, for more detail on softener setup.  Press NEXT to go to
step 4.  Press REGEN to return to previous step.

Step 4 - Next Regeneration Time (hour): 

Set the hour of day for regeneration

using 

 or 

 buttons.  AM/PM toggles after 12.  The default time is 2:00 a.m.

This display will show “REGEN” on 0 GAL if system is set for immediate
regeneration.  See table 6, page 19.  Press NEXT to go to step 5.  Press REGEN
to return to previous step.

Step 5 - Next Regeneration Time (minutes):

 Set the minutes of day for

regeneration using 

 or 

 buttons.  This display will not be shown if system is

set for immediate regeneration.  Press NEXT to exit Installer Displays/Settings.
Press REGEN to return to previous step.

Figure 9

STEP 1

STEP 3

STEP 2

STEP 1

STEP 2

STEP 5

STEP 4

STEP 3

RETURN TO

NORMAL MODE

All manuals and user guides at all-guides.com

Summary of Contents for Economical Water Conditioning System Series H-100

Page 1: ...05 Manufactured by HELLENBRAND INC 404 Moravian Valley Road Waunakee Wisconsin 53597 Phone 608 849 3050 Fax 608 849 7398 Web www hellenbrand com Email info hellenbrand com All manuals and user guides...

Page 2: ...g your water softener please contact the dealer who installed this system TABLE OF CONTENTS Job Specification Sheet Page 2 Operating Conditions 2 Soft Water Basics 3 Frequenty Asked Questions 3 Pre In...

Page 3: ...for buildup of insoluble materials It is recommended to periodically clean the salt keeper no matter what kind of salt you are using See page 9 miscellaneous 2 for details on cleaning REMEMBER Salt is...

Page 4: ...s built up heavily with lime and or iron must be replaced If piping is blocked with iron additional equipment must be installed ahead of the water conditioner to correct the problem Drain Line The con...

Page 5: ...o connecting the drain line flow control fitting Leave at least 6 between the drain line control fitting and solder joints when soldering pipes that are connected on the drain line control fitting Fai...

Page 6: ...starts coming out of the drain line open the by pass inlet valve all the way and allow to run out the drain until water clears Then slowly place the by pass into the normal operation mode by opening t...

Page 7: ...it Installer Displays Settings Step 3 Day Override This sets the number of days between regenerations If value set to oFF regeneration initiation is based solely on gallons used If value is set as a n...

Page 8: ...TODAY will flash on the display to indicate that the system will regenerate at the preset delayed regeneration time If you pressed the REGEN button in error pressing the button again will cancel the r...

Page 9: ...uns downward and is unobstructed When brine water quits running at the drain be sure to leave the drain valve open until you start the system up again 5 At this time the salt keeper has very little wa...

Page 10: ...en main or regenerant piston G Replace main or regenerant piston 3 Control valve does not regenerate A Transformer unplugged A Connect transformer automaticallly when REGEN button B No electric power...

Page 11: ...er ahead of softener C Resin bed mushing due to high amount C Rebed softener Install dechlorinaton system of oxidizers in water supply chlorine 14 Iron in softened water A Iron has fouled resin bed A...

Page 12: ...y 18x40 Blue 1 3 S75 1 c Brine Tank Assy 24x41 Black 1 3 531100302221 3 d Brine Tank Assy 24x50 Black 1 3 551100302221 3 7 3 8 x 6 Brine Line 1 2 H1023 06 8a 18x33 Brine Tank Tank Blue 1 2 1833BL b 18...

Page 13: ...the software version ex 154 and then reset the valve to the service position Do not use vaseline oils other hydrocarbon lubricants or spray silicone anywhere A silicon lubricant may be used on black o...

Page 14: ...washes injector plugs are located in both holes The nuts and caps are designed to be unscrewed or tightened by hand or with the special plastic wrench If necessary a pliers can be used to unscrew the...

Page 15: ...pe wrench to tighten or loosen nuts or caps Do not place screwdriver in slots on caps and or tap with a hammer Do not use pipe dope or other sealants on threads Teflon tape must be used on threads of...

Page 16: ...ts and caps are designed to be unscrewed or tightened by hand or with the special plastic wrench If necessary a pliers can be used to unscrew the nut or cap Do not use a pipe wrench to tighten or loos...

Page 17: ...1 15 V3151 Nut 1 Quick Connect 2 2 15 V3150 Split Ring 2 3 15 V3105 O Ring 215 2 4 15 V3188 01 Fitting 3 4 Brass Sweat 2 1 4 15 V3007 03 Fitting 3 4 Brass Sweat Asy 1 QTY ITEM NO ORDER NO DESCRIPTION...

Page 18: ...060 28 060 42 090 56 120 84 180 112 240 140 300 168 360 High Salting 24 230 32 310 32 310 48 460 64 620 96 930 129 240 161 550 193 860 Water Usage U S Gallons Normal Backwash Longer Backwash High Max...

Page 19: ...timated Regeneration occurs at the next Regen Set Time when gallons capacity reaches 0 or the specified number of days between regenerations is reached AUTO On 0 oFF Reserve capacity not automatically...

Page 20: ...E ARE EXPRESSLY LIMITED TO A TERM OF TWO 2 YEARS SOME STATES DO NOT ALLOW LIMITATIONS ON HOW LONG AN IMPLIED WARRANTY LASTS SO THE ABOVE LIMITATION MAY NOT APPLY TO YOU As a manufacturer we do not kno...

Reviews: