Fix cage nuts in the mounting
frame
Assemble the mounting bracket in
a suitable position.
Slide the shelf in position and
fix the shelf with the supplied
mounting screws
Finished
8.3 Electrical installation
8.3.1 Pre requisites
The sub –rack have markings for all terminations.
All cables shall be rated at Min 90 deg C.
Electrical terminations shall be tightened with 5Nm.
All connection screws are M5 x 12mm.
DC Input-Individual (per module), observe polarity.
AC Input / AC output –Common (per shelf), respect phases.
Wire all positions in the sub-rack for future expansion.
19
– Bravo ST 230 VAC– User manual – v7.3
Bravo ST Shelves Installation
Summary of Contents for BRAVO ST 230 VAC
Page 39: ......