Figure 2: Picking packaging: Pallet with 19 modules or fewer 

 

Exercise caution when working with the modules!  

 

 

Carry the modules with both hands. Do not use the connection sockets or cables(s) as a handle. During the 
transport and installation, take care that no pressure or tension is exerted on connection sockets and cables. 

 

Protect the modules from any hard knocks! Do not set the modules down roughly on hard ground. Do not set 
the modules down on their corners. Do not place the modules on top of each other unprotected. Do not place 
any objects on the modules. 

Never stand on the modules!

 Do not allow the modules to fall or use hard or 

pointed objects on them. 

 

Special  care  must  be  taken  to  connect  the  modules  in  accordance  with  the  instructions  and  should  not  be 
forced. Keep all electrical contacts clean and dry.  

 

A dry, well-ventilated room should be used to store the modules if necessary. 

 

For the system documentation, it is advisable to make a note of the serial number and address of the place of 
installation on the installation plan. 

 

Do not install any damaged modules. 

 

Please observe the specific instructions for handling solar modules with AR glass. 

Compared with non-coated glass, the surface of AR glass has a similar resistance to mechanical or chemical influences 
and should be handled with a similar level of care. However, due to its special reflective properties, light soiling is more 
visible than on non-coated glass. In particular, fats and oils are already visible in small quantities and may influence 
transmission. In order to avoid hand prints, the modules should only be touched with clean gloves. 

4. Information on the module 

Certification and Performance Data  

For the performance data and instructions on certificates for our brand modules, please refer to the datasheets for 
the respective series.

 

Use 

Please observe the following points in particular for the use of our brand modules: 

 

The installation or operation of the solar modules is permissible up to an altitude of max.  2000 m above sea 
level. 

 

The function of the modules is tested at an ambient temperature of -40 to +40°C. This area should be adhered 
to. 

 

The solar module is not saltwater-resistant (recommended distance from the sea: 500 m). 

 

The module must not be subjected to unusual chemical loads (e.g. emissions from manufacturing plants).  

 

Do not immerse the solar module in liquid.  

Summary of Contents for NeMo 3.0

Page 1: ...Installation and operating manual www heckert solar com Status 08 2021...

Page 2: ...ny time without prior notice Please use the most current copy You can find this on our homepage under http www heckertsolar com de downloads partner download center montage html This installation and...

Page 3: ...veral hours Rear ventilation The output of solar modules decreases considerably as the modules heat up Rear ventilation avoids yield impairing heat accumulation The so called chimney effect draught be...

Page 4: ...e modules in their packaging until ready for installation Always set the pallets on a reinforced level ground and do not stack them under any circumstances Standard packaging Picking packaging Number...

Page 5: ...ease observe the specific instructions for handling solar modules with AR glass Compared with non coated glass the surface of AR glass has a similar resistance to mechanical or chemical influences and...

Page 6: ...llation situation and the system used Please observe the installation situations in the following table and the resulting maximum load capacity of the modules The values shown Figure 3 correspond to t...

Page 7: ...installation and to facilitate installation our module frames are fitted with holes for load restraints Screws with hexagon socket head caps are fixed in these holes in the module frame The screws are...

Page 8: ...trained and skilled personnel No damaged modules may be installed Both external connector sockets are fitted with a cable 1150 mm in length and connectors The socket is located on the right hand side...

Page 9: ...or to the inverter Please use solar cables that comply with the standard EN 50618 class 5 and the respective requirements The minimum cross section is 4mm Cable losses should be 1 At greater distances...

Page 10: ...lightning protection system in place or planned for the building the PV system must be integrated in the protection system against a direct lightning strike When using transformer less inverters due...

Page 11: ...nd service warranty Information and terms for our product and service warranties can be found on our homepage under www heckert solar com 9 Exclusion of liability These installation and operating inst...

Page 12: ...12 Excerpt from MC4 crimping instructions Multi contact source...

Page 13: ...13...

Page 14: ...14...

Page 15: ...15...

Page 16: ...16...

Page 17: ...17 Heckert Solar GmbH Carl von Bach Stra e 11 D 09116 Chemnitz...

Reviews: