8
ASSEMBLY INSTRUCTIONS
6.
Now, place the RIGHT SIDE PANEL on the side lip of the FLOOR PANEL. Align it vertically between
both the FRONT and BACK SIDE PANELS. Insert the panels (6) INNER WALL CONNECTORS
into corresponding holes of the FRONT and BACK PANELS. Push down to lock in place.
7.
Lift the internal ROOF above the sauna and place on top of SIDE PANELS, feeding the control
panel wiring and heater cables through the corresponding holes of the ceiling. (See Step 8 for
additional wire connection instructions). Secure ROOF to the sauna with (4) 1-1/8” SCREWS.
*While placing the roof over the sauna, feed each of the heater
cables on the side and back walls, and the wire harness and power
plug in the back left corner, through the corresponding holes on
the perimeter of the roof.