3
1. Faceplate
2. HSUFDC body
3. Steel back plate
4. Back box
Step 2: Fix the black steel wall plate to your back box
Align the holes on the steel plate with the ones on the back box in your
wall. Fix in place with the supplied screws, taking care to ensure the
mount is level.
Step 3: Wire up the Thermostat & fix in place
Pull the wires through from the heating system and expose if required.
Loosen the tension screws to allow the wires to be inserted and fixed.
Position the cables as shown in the wiring diagram and ensure each
screw is tightened correctly.
ENSURE ALL ADHESIVES AND LEVELLING COMPOUNDS ARE
FULLY CURED BEFORE SWITCHING ON YOUR UFH SYSTEM
CONSULT ADHESIVE AND/OR LEVELLING COMPOUND
MANUFACTURER GUIDELINES FOR DRYING/CURING TIMES
1
2
3
4