
VM-S
ERIES
I
NSTALLATION
, O
PERATION
AND
S
ERVICE
M
ANUAL
22 of 71
SECTION 7: OPTIONAL HEATER ACCESSORIES
7.1 U-Tube Confi
g
uration
Heaters are appro
v
ed for optional U-T
u
be
config
u
rations.
The U-T
u
be may be installed in a standard horizontal
position. When
u
sing a U-T
u
be config
u
ration, the
follo
w
ing additional r
u
les m
u
st be adhered to:
• A minim
u
m of 10' (3 m) on VM-80 and a minim
u
m
of 15' (4.5 m) on VM-115/150/200 is req
u
ired
bet
w
een the b
u
rner and the U-T
u
be.
• The correct t
u
rb
u
lator (
See Page 18, Figure 6.4
)
m
u
st be installed in the last standard section of
t
u
be.
• The b
u
rner m
u
st ne
v
er be operated in a tilted
position.
• The heater m
u
st be properly s
u
pported at all loca-
tions.
See Page 24, Figure 15
.
WARNING
Cut/Pinch Hazard
Wear protective gear during installation,
operation and service.
Edges are sharp.
Failure to follow these instructions can result
in injury.
Summary of Contents for VM-115
Page 2: ......
Page 4: ......
Page 6: ......
Page 69: ...SECTION12 TROUBLESHOOTING 63 of 71 12 3 Troubleshooting Flow Chart...
Page 70: ...VM SERIES INSTALLATION OPERATION AND SERVICE MANUAL 64 of 71...
Page 72: ...VM SERIES INSTALLATION OPERATION AND SERVICE MANUAL 66 of 71 12 5 Pneumatic Connections...
Page 74: ...VM SERIES INSTALLATION OPERATION AND SERVICE MANUAL 68 of 71...
Page 77: ...SECTION 14 GENERAL SPECIFICATIONS 71 of 71...
Page 78: ......
Page 79: ......
Page 80: ......