
VM-S
ERIES
I
NSTALLATION
, O
PERATION
AND
S
ERVICE
M
ANUAL
18 of 71
Step 6.3.2 Couplin
g
and Tube Assembly (Continued)
Step 6.4 Turbulator Installation
10' ± 1'
(305 cm ± 25 cm)
Total Overall
Tube Length
7' 6" ± 1'
(229 cm ± 25 cm)
Model
Tube Len
g
th
Minimum
VM-80
20’ (6 m)
VM-115
30’ (9 m)
VM-150
40’ (12 m)
VM-200
50’ (15 m)
Tw
ist
Pull String
Tab
Fold tab around outside
of tube nearest to the vent to
hold turbulator in place.
Turbulator
Section
Turbulator
Adapter
Description
Part Number
T
u
rb
u
lator Adapter
03051503
T
u
rb
u
lator Section
03051504
T
u
be
91409XXX
Turbulator Installation
VM-80
2nd 10' Section
VM-115
3rd 10' Section
VM-150
4th 10' Section
VM-200
N/A
T
u
rb
u
lator m
u
st be installed in
the last standard section of
t
u
be. T
u
rb
u
lator is not req
u
ired
on the VM-200.
Summary of Contents for VM-115
Page 2: ......
Page 4: ......
Page 6: ......
Page 69: ...SECTION12 TROUBLESHOOTING 63 of 71 12 3 Troubleshooting Flow Chart...
Page 70: ...VM SERIES INSTALLATION OPERATION AND SERVICE MANUAL 64 of 71...
Page 72: ...VM SERIES INSTALLATION OPERATION AND SERVICE MANUAL 66 of 71 12 5 Pneumatic Connections...
Page 74: ...VM SERIES INSTALLATION OPERATION AND SERVICE MANUAL 68 of 71...
Page 77: ...SECTION 14 GENERAL SPECIFICATIONS 71 of 71...
Page 78: ......
Page 79: ......
Page 80: ......