
Wiring Centre
8
System Setup
Zone Type Toggle Switches
DIP Switches
1.
Demand RF Test
2.
Enable Creepage
3.
Heat Enable Delay 1 minute.
4.
Heat Enable Delay 2 minutes.
In normal use these DIP switches can be ignored and should be
Heat Enable Delay, Dip Switches 1 & 2
Switch 2 ON, Switch 1 OFF = Will delay the heat output for 1 minute.
Switch 2 OFF, Switch 1 ON = Will delay the heat output for 2 minutes.
Switch 2 ON, Switch 1 ON = Will delay the heat output for 3 minutes.
1
ENABLE CREEPAGE
HEAT ENABLE 1
DELAY (MINS) 2
ON
DIP
2
3
4
AUX
ZONE 1
1 2 3
There is a 3 position toggle switch above each zone. This switch allows
To enable creepage protection, put switch 3 to the ON position
Creepage Protection, Dip Switch 3
Position 1 - Zone output only.
When a thermostat is in demand, the UH8-RF
will activate the Zone output to actuators only,
PUMP
and
HEAT
outputs will remain off.
Position 2 - Zone output with heat demand.
When a thermostat is in demand the UH8-RF
will activate the zone output to the actuators
and heat demand to the boiler.
Position 3 - Zone output with heat demand
and manifold pump.
When a thermostat is in demand, the UH8-RF
will activate the zone output to the actuators,
the heat demand to the boiler and the manifold
pump.
ZONE 1
1 2 3
ZONE 1
1 2 3
There is a 4 way dip switch responsible for 3 functions;
left in the off position.
3 different switched outputs when the thermostat demands heat.
Summary of Contents for UH8-RF V2
Page 1: ...Model UH8 RF V2...
Page 10: ...Notes Wiring Centre 10...