
12
35048 Rev L
03/04
IB75 B-VENT GAS APPLIANCE
G. FINISHING
1.Combustible Finishing Material
Material made of or surfaced with wood, compressed
paper, plant fibers, plastics, or any material capable
of igniting and burning, whether flame proofed or not,
plastered or unplastered (this includes drywall).
2.Noncombustible Finishing Material
Material which will not ignite and burn. Such materials
are those consisting entirely of steel, iron, brick, tile,
concrete, slate, glass or plasters, or any combination
thereof, or have a UL fire rating of zero (0).
3.High Temperature Sealant Material
Sealants that will withstand high temperatures: General
Electric RTV103 (Black) or equivalent. Rutland, Inc.
Appliance Mortar #63, or equivalent.
A high temperature sealant, 1/8 in. wide minimum bead,
must be used to close off gaps between the appliance
and facing to prevent cold air leaks. See Figure 13.
A combustible mantel may be installed. Please refer
to Figure 3.
WARNING!
Air slots on this appliance cannot, in any way, be covered as it may create a fire hazard.
H. APPLIANCE PREPARATION
Figure 13 - Combustible Finishing Material
1.Attach the Hood
The hood is to be located under the top front face.
a.
It must be attached or a fire hazard may result. Locate the three screws just inside the upper section of the
appliance.
b.
Position the hood and slide it into position. See Figure 14.
c.
Tighten the three screws.
Figure 14 - Attaching the Hood