Heatilator • AVEO Series DV • 4058-210 Rev P • 1/13
27
2. Top Vent - Vertical Termination
No Elbow
Figure 7.7
Figure 7.7b 12 ft to 30 ft Vertical Run
Figure 7.7c 31 ft to 60 ft Vertical Run
Install Baffl e
• Remove screws from fl ue (fi rebox top).
•
Using the screws removed, Install baffl e according to your
installation requirements. See Figures 7.7b and 7.7c.
12 ft (3.66 m) min.
60 ft (18.29 m) max.