4
World Leaders in Ultra-Pure Heating
www.heateflex.com
405 E. Santa Clara St., Arcadia, CA 91006-7218
O
: (626) 599-8566
F
: (626) 599-9567
Shipping and Unpackaging Procedures
The proper shipping procedure for the Aquarius
Deionized (D.I.) Water Heating
Systems includes shipping the unit in a horizontal position as shown and described
in the illustration below.
The Aquarius
D.I. Water Heating Systems are factory tested to ensure that you
receive an operational unit. The Aquarius
D.I. Water Heating Systems are
packaged and shipped in the horizontal position along its side. The unit is wrapped
in bubble pack, plastic wrapped and then placed onto a pallet with a 2 1/2
”
thick
impact absorbing foam pad. The unit is strapped down to the pallet then covered
with a corrugated box or crating material, taped and then re-strapped.
Once the Aquarius
D.I. Water Heating System has thoroughly been inspected for
damage that may have occurred during shipping (if any damage has occurred refer
to the Receiving Inspection Procedure of this Instruction Manual), the unit will need
to be moved from its horizontal shipping position to its normal functional vertical
position. Remove any packaging materials such as the box or crate, Styrofoam
block, straps, etc. Once the unit is free and ready to be moved, verify that the plinth
base and/or eyebolts are in position. The unit can be transported using either the
supplied eyebolts or by fork-lift truck. Using the eyebolts, systematically distribute
the load using the following parameters. For cable angle 45°, use a max load of
1080 pounds. For cable angle 60°, use a max load of 1440 pounds. For cable angle
90°, use a max load of 3060 pounds. Using a fork-lift truck, ensure that the unit is
under 3150 pounds. Carefully lift the top part of the unit (opposite of the plinth base)
and tilt the unit from its horizontal shipping position to its operational vertical position.
Remove the stretch and bubble wrap.