![Heat Trap Solar HTS340-CP1 Operating Instructions Manual Download Page 14](http://html.mh-extra.com/html/heat-trap-solar/hts340-cp1/hts340-cp1_operating-instructions-manual_2115988014.webp)
Heat Trap Hybrid Heat Pump Installation & O
6.
Post Installation Inspection Checklist
On completion of the installation, inspect and check off each item in the check list.
Check Sheet
-
Ensure the system is well ble
-
Check that the tank is installed on a level sturdy surface.
-
Ensure that a composite base has been
-
Check there is no water leaking from the heat pump flow and return lines and fittings
-
Check the wiring between the tank and the
-
Ensure a dedicated water supply/
-
Check the water strainer on
-
Ensure the Heat pump is connected to a 240 volt 10
-
Ensure power is connected and heat pump is operational
Installed By…………………………………………………… Date…………………………………
Inspected By …………………………………………………. Date…………………………………
Notes:
……………………………………………………………………………………………………………………………………………………………
……………………………………………………………………………………
……………………………………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………………………………………
……………………………………………………
This operating instruction is only a guide
responsible for any damage to person or property that results during the installation or subsequent
use of this heat pump and related system components
Heat Trap Hybrid Heat Pump Installation & O
Post Installation Inspection Checklist
On completion of the installation, inspect and check off each item in the check list.
is well bled and ALL air has been purged from the system.
he tank is installed on a level sturdy surface.
omposite base has been installed
here is no water leaking from the heat pump flow and return lines and fittings
he wiring between the tank and the heat pump unit is properly connected.
dedicated water supply/isolation valve has been installed.
the cold water inlet is clean.
he Heat pump is connected to a 240 volt 10-amp GPO
is connected and heat pump is operational
Installed By…………………………………………………… Date…………………………………
Inspected By …………………………………………………. Date…………………………………
……………………………………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………………………………………
……………………………………………………
only a guide. As such, Heat Trap Solar Pty Ltd shall
responsible for any damage to person or property that results during the installation or subsequent
and related system components.
Heat Trap Hybrid Heat Pump Installation & Operating Instructions
14
On completion of the installation, inspect and check off each item in the check list.Post Installation
d and ALL air has been purged from the system.
□
□
□
here is no water leaking from the heat pump flow and return lines and fittings
□
heat pump unit is properly connected.
□
□
□
□
□
……………………………………………………………………………………………………………………………………………………………
………………………………………………………………………
……………………………………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………………………………………
shall not be held
responsible for any damage to person or property that results during the installation or subsequent