MODBUS Installation and Operation Manual
13
HT# 059266-00A
note:
Use 'Vari-Boost Adjustment' when 'Boost Mode' is set to Vari-Day or Vari+ESD . Use
'Manual Boost Time' when 'Vari-Boost Adjustment' is set to Manual Boost .
note:
'Boiler Status' range changes with 'Boiler Type' . For example: when 'Boiler Type' is set to 0,
'Boiler Status' range is 0 to 1; when 'Boiler Type' is set to 1, 'Boiler Status' range is 0 to 2
note:
Use 'Day Heat Adjustment', ' Fast Cycle', 'Night Heat Adjustment', and
'Heat Establish Pressure' if 'Operation Mode' is set to 0 .
note:
Use 'Setback' if 'Operation Mode' is set to 1 .
note:
Use 'Last Stage Hold', 'Min Runtime', 'Purge', 'Reaction Time', 'Standby Delay' when 'Logic Mode' is set to 0 .
note:
Use 'Reaction Time' when 'Lead Stage Rotation Mode' is set to 0 .
note:
Use 'Throttle Range' when 'Logic Mode' is set to 1 .
note:
Use 'Max Target' when 'Control Mode' is set to 0 .
note:
The MPCQ Platinum has a schedule, which is 7-days, 4 day/night pairs per day . For example: Register
38 is the first DAY schedule of Monday; Register 39 is the first NIGHT schedule of Monday; Register 46
is the first DAY schedule of Tuesday; Register 47 is the first NIGHT schedule of Tuesday and so on .
note:
Use MPCQ Platinum Installation and Operation manual for supplementary information .