
13
HORIZONTAL VENTING
Kit No.
H Max. Run
DVK-01D
DVK-01TRD 24" (610 mm)
Figure 8. Corner Installation
NOTE: BE-41 model is tested and approved
to use 45° elbows in corner installations.
However, 90° elbows will result in better per-
formance.
Figure 6. Straight Up Vertical Venting
NOTE:
On vertical venting configurations where the vertical
component is over 10 feet, you may want to install the
vertical baffle (VERT-BAF) (see Figure 7).
STRAIGHT UP
VERTICAL VENTING
V (FT.)
40' MAX. (12.4 M)
NOTE:
Center the vertical baffle over the 5 exhaust pipe.
Fasten in place with self tapping screws.
Figure 7. Vertical Baffle
VERTICAL
BAFFLE
CENTER VERTICAL
BAFFLE ON 5”
EXHAUST PIPE
5” EXHAUST
PIPE
45-DEGREE
ELBOW
90-DEGREE
ELBOWS
H