
Heat & Glo • SOHO-N-AU • 2197-900 Rev. C • 9/09
14
Figure 5.8
2. Vertical Termination
- (continued)
Three Elbows
V
2
H
2
V
1
INSTALLED
HORIZONTALLY
H
1
Three Elbows
V
1
Minimum
H
1
+ H
2
Maximum
300 mm
610 mm
610 mm
910 mm
910 mm
1.5 m
1.2 m
2.1 m
1.5 m
4.3 m
V
1
+ V
2
+ H
1
+ H
2
Maximum = 11.9 m
H
1
+ H
2
Maximum = 4.3 m