
Heat & Glo • SOHO-B-CEB, SOHO-N-CEB, SOHO-P-CEB • 2111-980 Rev. i • 3/13
40
D. Disassemble Vent Sections
• Rotate either section (see Figure 10.7) so the seams on
both pipe sections are aligned as shown in Figure 10.8.
• Pull carefully to separate the pieces of pipe.
Figure 10.8 Align and Disassemble Vent Sections
Figure 10.7 Rotate Seams for Disassembly