Heat & Glo • SL-550 / 750 / 950TR-D • 2044-985 Rev. J • 6/06
19
Figure 5.
Framing Dimensions
Framing should be
constructed of 2 X 4
lumber or heavier.
The framing headers
may rest on the
appliance stand-offs.
VENT
FRAMING
HOLE
E
D
Model
A
B
C
D
E
SL-950TR-D
49”
42 1/4”
16 1/4”
44”
31 7/8”
SL-750TR-D
42”
38 1/4”
16 1/4”
41”
27 7/8”
SL-550TR-D
37”
33”
16 1/4”
36 1/2” 24 3/8”
A
B
C
Step 2. Framing the Appliance
Appliance framing can be built before or after the appliance
is set in place. Framing should be positioned to accommo-
date wall coverings and appliance facing material. The dia-
gram below shows framing reference dimensions.
CAUTION: MEASURE APPLIANCE DIMENSIONS AND
VERIFY FRAMING METHODS AND WALL COVERING
DETAILS BEFORE FRAMING.
WALL STUD
NON-COMBUSTIBLE ZONE
IS DEFINED BY 3” ABOVE THE
ELBOW FOR THE ENTIRE
WIDTH AND DEPTH (BEHIND THE
FRONT HEADER) OF THE FIREBOX.
3”
2-1/4”
The center of the
framing hole is one
(1) inch (25.4mm)
above the center of
the horizontal vent
pipe.