Heat & Glo • Passage • 700-900 Rev. M • 12/07
12
Framing should be
constructed of 2 X 4
lumber or heavier.
A
. ................ 45 1/4” (1150mm)
B
. .................. 39 1/4” (997mm)
C
. .................. 20 1/2” (521mm)
D
. ......................80” (2032mm)
Center of pipe
. ..79” (2007mm)
Figure 3. Framing Dimensions
Shows center of
10” x 12” framing
for venting with 3
feet vertical and
90
0
elbow.
Step 2. Framing the Appliance
Appliance framing can be built before or after the appliance
is set in place. Framing should be positioned to accommo-
date wall coverings and appliance facing material. The dia-
gram below shows framing reference dimensions.
CAUTION: MEASURE APPLIANCE DIMENSIONS AND
VERIFY FRAMING METHODS AND WALL COVERING
DETAILS BEFORE FRAMING.
A
B
C
D
NOTE:
HORIZONTAL TERMINATION IS
NOT PERMITTED ON UNITS
CONVERTED TO USE
LP
GAS.