Heat & Glo • 6000GL-IPI-R, 6000GL-IPI-S • 2102-900 Rev. B • 5/06
3
-
Table of Contents
-
Section 9:
Gas Information
A.
Fuel
Conversions
...................................... 34
B.
Gas
Pressures
.......................................... 34
C.
Gas
Connection
........................................ 34
Section 10:
Electrical Information
A.
Recommendation
for
Wire
........................ 36
B. Connecting to the Appliance ..................... 36
C. Intellifi re Ignition System Wiring ................ 36
D. Junction Box Installation ........................... 37
Section 11: Finishing
A.
Mantel
Projections
.................................... 38
B
.
Facing Material ......................................... 38
C.
Finishing
Material
...................................... 39
Section 12:
Appliance Setup
A.
Remove
Shipping
Materials
...................... 40
B. Clean the Appliance
.................................. 40
C. Accessories .............................................. 40
D. Install the Refractory ................................. 40
E. Ember Placement ..................................... 41
F. Positioning the Logs
................................. 42
G.
Glass
Assembly
........................................ 44
H.
Screen
Mesh
............................................. 44
I.
Grilles
and
Trim
......................................... 44
J. Air Shutter Setting ..................................... 44
Section 13:
Operating Instructions
A.
Before
Lighting
Appliance
......................... 45
B.
Lighting
Appliance
..................................... 46
C. After Appliance is Lit ................................. 47
D.
Frequently
Asked
Questions
..................... 47
Section 14:
Troubleshooting
A. Intellifi re Ignition System ........................... 48
Section 15:
Maintaining and Servicing Appliance
. .......... 50
Section 16:
Reference Materials
A. Appliance Dimension Diagram ................. 52
B.
Vent
Components
Diagrams
..................... 53
C. Service Parts ............................................ 58
D. Warranty ................................................... 61
E. Contact Information .................................. 62
Section 1: Listing and Code Approvals
A.
Appliance
Certifi
cation
................................... 4
B.
Glass
Specifi
cations
...................................... 4
C.
BTU
Specifi
cations
........................................ 4
D.
High
Altitude
Installations
.............................. 4
E.
Non-Combustible
Materials
Specifi
cations
.... 4
F.
Combustible
Materials
Specifi
cations
............ 4
G. Requirements for the Commonwealth
of
Massachusetts
.......................................... 5
Section 2: Getting Started
A.
Design
and
Installation
Considerations
......... 6
B. Tools and Supplies Needed ........................... 6
C.
Inspect
Appliance
and
Components
.............. 6
Section 3:
Framing and Clearances
A.
Selecting
Appliance
Location
........................ 7
B.
Constructing
the
Appliance
Chase
................ 8
C.
Clearances
.................................................... 8
D.
Mantel
Projections
......................................... 9
Section 4:
Termination Locations
A
.
Vent Termination Minimum Clearances ....... 10
Section 5:
Vent Information and Diagrams
A.
Vent
Table
Key
............................................. 12
B.
Use
of
Elbows.............................................. 12
C.
Measuring
Standards
.................................. 12
D.
Vent
Diagrams
............................................. 13
Section 6:
Vent Clearances and Framing
A.
Pipe
Clearances
to
Combustibles
............... 22
B.
Wall
Penetration
Framing
............................ 22
C.
Vertical
Penetration
Framing
....................... 23
Section 7:
Appliance Preparation
A. Top or Rear Vent ......................................... 24
B. Installing the Non-combustible Board .......... 25
C. Securing and Leveling the Appliance .......... 25
Section 8:
Installing Vent Pipe
A. DVP Pipe Assembly of Vent Sections .......... 26
B. Disassembly of Vent Sections ..................... 28
C. Installing Heat Shield & Termination Cap ... 29
D. SL-D Pipe Assembly of Vent Sections ......... 30
E. Installing Wall Shield Firestops and
Horizontal
Termination
Cap
......................... 31
F. Installing Roof Flashing and Vertical
Termination
Cap
.......................................... 32