![Heartland ROCKPORT Assembly Manual Download Page 35](http://html.mh-extra.com/html/heartland/rockport/rockport_assembly-manual_2114822035.webp)
33
Flush
FRONT GABLE UNIT
PARTS REQUIRED:
Front Gable Unit
Place gable unit primed side down on gable ladders.
Ensure panels are fl ush at peak of ladder and fl ush along top edge of ladder assembly.
Fasten with 1-5/8" screws spaced evenly as shown
(Fig. G)
.
2
3" (7,6 cm)
Fig. G
Flush
Flush
1-5/8"
(4,1 cm)
Screws
x2
Ladder Assemblies
FINISH
Your gable unit is assembled.
x16
1-5/8" (4,1 cm)
HINT:
Pre drill to avoid
splitting wood.
Place ladder assemblies in rafter jig, fl ush into corner and fl ush to
AYB
.
Toe-screw ladder assemblies together with (4) 3" screws
(Fig. F)
.
3"
(7,6 cm)
Screws
Flush
x4
7-1/2"
(19,1 cm)
Approximately
Fig. F
AYB
1
BEGIN
Flush at peak