
7
Residential Wall Mount Hood
C. Top Installation
1.
Locate and mark the centerline of the
hood.
2.
Use wood panel of 1/2" thick by 12"
high (see the sketch to determine width
of panel).
3.
Screw two 2" X 4" (thin side down)
perpendicular and at the bottom of the
wood panel. See sketch for location.
4.
Screw a second set of 2" X 4’s angled
to reach the front end of both previous
2" X 4"s and each top side of the wood
panel.
5.
Screw another 2" X 4" inside the ends
of first set of 2" X 4"s (wide side
down).
6. Add one 2" X 4" (thin side down) in the
middle when using a to blower unit. Add
two 2" X 4’s (thin side down) in the
middle when using a three blower unit.
With one blower unit, no middle stud is
necessary
7. Drill 7/8" diameter hole through the 1/2”
tick wood panel and drywall 2” above
the top of the hood for the conduit wire.
8. Run 120 VAC, 15A (minimum) circuit
electrical power cable from the service
panel through the 7/8" hole of drywall.
MAKE SURE THE POWER IS OFF.
To p o f th e h o o d
O p tio n a l w o o d fra m e s u p po rt u s e d
w h e n th e u n it in c lu d e s tw o b lo w e rs
Drill 7 /8” hole in the drywall
for the power supply.
CL
1
2
5
6
4
4
3
3
3 /4 "
3 /4 "
1 2 "
1 5 -1 /2 "
1 2 "
11 "
W o o d p a n e l o f 1 /2 " th ick