
VS0952_E
12/30/2009
22
M
OBILE
H
OME
I
NSTALLATION
Your
Hearthland
Series
appliance
has
been
tested
and
listed
for
mobile
home
installation.
It
may
be
installed
in
a
mobile
home
as
a
"Free
Standing
Stove"
or
a
"Hearth
Stove",
see
detailed
install
and
clearance
re
‐
quirements
in
these
sections
as
they
imply
there.
(
See
Section
#
2.6
“Outside
Air
Intake”)
In
addition
to
all
previously
detailed
installation
requirements,
mobile
home
installations
must
meet
the
following
requirements:
•
Permanently
bolt
your
stove
to
the
floor
using
base
vent
holes.
•
Electrically
ground
your
stove
or
the
pedestal
to
the
steel
frame
of
the
home.
Use
a
number
8
gauge
copper
wire,
or
equivalent.
•
The
stove
must
have
a
permanent
outside
air
source
with
a
¼
inch
screen
over
the
inlet.
•
For
transportation
all
chimney/vent
above
the
mobile
home
must
be
removed.
•
Chimney/PL
Vent
must
be
3”
or
4”
PL
Vent
and
must
extend
a
minimum
or
36”
above
the
roofline
of
the
mobile
home
and
must
be
installed
using
a
UL
/
ULC
listed
ceiling
fire
stop
(J)
and
rain
cap
(L),
figure
26.
L
K
J
I
H
G
D
C
B
A
E
F
•
FOR
MOBILE
HOME
INSTALLATIONS,
OUTSIDE
AIR
INTAKE
IS
REQUIRED.
•
WARNING:
DO
NOT
INSTALL
STOVE
IN
SLEEPING
ROOM.
•
CAUTION:
THE
STRUCTURAL
INTEGRITY
OF
THE
MANUFACTURED
HOME
FLOOR,
WALL,
AND
CEILING
/
ROOF
MUST
BE
MAINTAINED!
•
INSTALL
VENT
AT
CLEARANCES
SPECIFIED
BY
THE
VENT
MANUFACTURER.
IMPORTANT
A
Floor
Pad
B
Combustion
Air
Intake
C
Fresh
Air
Duct
D
Fresh
Air
Hood
E
Stove
Exhaust
F
Pipe
Adapter
G
Clean
Out
Tee
H
Tee
Support
Bracket
I
Pipe
J
Fire
stop
Spacer
/
Ceiling
Sup
‐
port
K
Roof
Flashing
/
Storm
Collar
L
Rain
Cap
Summary of Contents for Hiawatha
Page 13: ...VS0952_E 12 30 2009 13 EXHAUST SYSTEM CONTINUED PELLET VENT TERMINATION...
Page 41: ...VS0952_E 12 30 2009 41 REPLACEMENT PARTS LIST...
Page 42: ...VS0952_E 12 30 2009 42 REPLACEMENT PARTS LIST CONTINUED...
Page 43: ...VS0952_E 12 30 2009 43 REPLACEMENT PARTS LIST CONTINUED...
Page 44: ...VS0952_E 12 30 2009 44 REPLACEMENT PARTS LIST CONTINUED...
Page 45: ...VS0952_E 12 30 2009 45 REPLACEMENT PARTS LIST CONTINUED...
Page 46: ...VS0952_E 12 30 2009 46 REPLACEMENT PARTS LIST CONTINUED...
Page 47: ...VS0952_E 12 30 2009 47 REPLACEMENT PARTS LIST CONTINUED...
Page 48: ...VS0952_E 12 30 2009 48 REPLACEMENT PARTS LIST CONTINUED...