
12
FIGURE 10
NOTE:
IF A 90° ELBOW IS
FIRST ATTACHED TO THE UNIT,
THE MAXIMUM HORIZONTAL
RUN H IS 2-FEET (.6M).
V
H
FT. (M)
FT. (M)
1' MIN.(.3M)
3' MAX.(.91M)
2' MIN.(.6M)
6' MAX.(1.8M)
3' MIN.(.9M)
9' MAX.(2.7M)
4' MIN.(1.2M)
12' MAX.(3.7M)
V + H = 30' (9.1M)
FLUEING WITH ONE (1) 90° ELBOW
USE SL D-SERIES COMPONENTS ONLY.