Figure 5.
Figure 7.
Figure 8.
UNINSTALLED POLE,
HEIGHT OF BAR
INSTALLED POLE,
HEIGHT OF BAR
HealthCraft Products Inc., Ottawa, Ontario, Canada. Copyright 2006. Specifications subject to change without notice.
Page 4 of 8
11
12
10
13
Figure 6.
10
14
13
6
2
17
HEIGHT OF HAND RAIL
Spring
Ring
Installed
Locking
Positions
ROT
ATI
ONAL
LOCK
ING POSITION
2
14
16
15
1
2
4
8
6
3
7
5
SUPERPOLE™ PREPARATION
B1.
See steps A1 and A2 on page 2. Complete these instructions and
then continue with step B2.
SUPERBAR™ PREPARATION
B2.
Unpack the SuperBar™ hand rail unit (10). Using the small hex
key wrench (11) and countersunk screw (12), attach one white plastic
pivot bushing (13) to top side of the SuperBar™ hand rail unit as
shown in
Figure 5
. Set aside the other plastic pivot bushing and
screw. Remove the cover sleeve (6) from the pole assembly (2).
B3.
Slide the SuperBar™ hand rail unit (10) onto the pole assembly
(2) as shown in
Figure 6
(side with attached pivot bushing to go on
first). Slide it on as straight as possible to avoid scratching the pole.
B4.
Unpack and slide the grooved collar (14) onto the pole (2) as
shown in
Figure 6
. Gently slide the collar up the pole to avoid scratch-
ing the pole. Next slide the other white plastic pivot bushing (13) and
the cover sleeve (6) (removed in step B2) up the pole (2).
IMPORTANT
- The next step is to fix the grooved collar (14) to the
pole (2). The position of the grooved collar determines the height of
the bar and the rotational locking position of the bar.
Alternate Installation Option
Steps
B5
and
B6
can be completed after the pole has been raised in
place (steps
A3
to
A7
on page 2) to better determine optimal height
and locking positions of the SuperBar™. You may also install just one
set screw to test a height/angle setting of the SuperBar™.
BE CERTAIN THAT THE GROOVED COLLAR IS AT THE
CORRECT HEIGHT AND ORIENTATION BEFORE PROCEEDING.
SUPERBAR™ INSTALLATION
B5.
Once the grooved collar (14) has been set to its desired location,
fasten the grooved collar to the pole (2) by installing and tightening
the three set screws (15) with the larger hex key wrench (16). You will
need to slide the spring collar (17) upward to gain access to the screw
holes.
IMPORTANT - These screws MUST be tightened until the
back end of the screw is flush with the collar
or injury may result
.
By tightening these set screws, the cone points will penetrate the pole
for positive engagement, thereby leaving permanent indentations in
the pole (refer to
Figure 8
).
NOTE!
Should you need to change the position of the height/angle
setting, we recommend that you change the height by at least one
inch. This will avoid set screw indentations from being too close to
each other and thereby weakening the pole.
B6.
Next, slide the spring collar (17) downward on the grooved collar
(14) as shown in
Figure 8
to retain set screws (15) while in service.
Inspect frequently to ensure screws and collar are tight.
B7.
Install the remaining white plastic pivot bushing (13) and secure it
with the countersunk screw (12) using the small hex key wrench (11).
B8.
See steps
A3
to
A7
on page 2. Complete these instructions to
finish the installation of your SuperPole™ with SuperBar™.
Your SuperPole™ with SuperBar™ is now installed.
1. Height of Hand Rail
- The height at which you fix the
grooved collar determines the height of the SuperBar™ hand
rail unit (10). Consider the optimal height of the bar from
sitting and standing positions. The height of the bar will
change as the pole is installed (dependant on the difference
in height between the ceiling and the pole - see
Figure 7
).
2. Rotational Locking Position
- Each of the grooves
correspond to a rotational locking position of the hand rail unit
(refer to
Figure 8
). You will want to fix the grooves to have the
hand rail lock in the most advantageous positions for your
assistance as discussed on page 1 ("Getting Started").
SUPERBAR™ INSTRUCTIONS
Prior to installing the SuperPole™ with SuperBar™, we
recommend that you first read through these instructions.